![Conductix-Wampfler Safe-Lec 2 Manual Download Page 23](http://html1.mh-extra.com/html/conductix-wampfler/safe-lec-2/safe-lec-2_manual_2651967023.webp)
Safe-Lec 2 Conductor Bar Manual
23
SECTION 11 - END POWERFEED ASSEMBLY
NOTE
• Installation is for 100 Amp Conductor Bar only.
Tools Needed
• 10mm A/F Wrench
• Suitable Sharp Knife
• Cable Stripper
• Cable Crimping Tool
• Suitable Cable Terminal (see list of recommended suppliers and references).
End Powerfeed Installation
1. Cut powerfeed end cap to suit cable diameter.
2. Pass cable through powerfeed end cap.
3. Crimp terminal to cable.
4. Fit bolt into joint plate (wings on tab to face upward).
5. Fit assembly into conductor bar.
6. Fit clamp end over joint plate and bolt. Secure with half nut. Tighten half nut to recommended torque value of 10 Nm (7-8 ft-lbs).
7. Fit terminal and secure washer and nut.
8. Tighten nut to recommended torque of 8 Nm (5-6 ft-lbs).
9. Push powerfeed end cap over assembly (ensure bolt is located in point “A” on powerfeed end cap).
NOTE
• Maximum cable size is 25 sq mm PVC 600/1000V stranded copper conductor (#4 AWG Extra Flexible).
These faces
to be flush
Figure 23-1
1. Joint Plate
2. Bolt
3. Clamp End
4. Half Nut
5. Washer
6. Nut
7. Powerfeed End Cap
1
3
2
4
5
6
7
A