![Condair US-Series Installation, Operation And Maintenance Manual Download Page 46](http://html.mh-extra.com/html/condair/us-series/us-series_installation-operation-and-maintenance-manual_2651664046.webp)
A Appendix:
Installation Checklist | 46
2588705_A_EN_1811_UB_IOM
UB
Installation Checklist
Mounting
□
Unit installed in a suitable location? Refer to
"Location Requirements" on page 20
.
□
Unit installed with suitable clearances? Refer to
"Clearance Requirements" on page 20
.
□
Mounting surface is stable and capable of supporting the full operating weight of the unit? Refer
to
"Weights" on page 16
.
□
Unit is level?
□
Unit is fastened securely?
Flexible Tubes Connection
□
Flexible tubes cleaned?
□
The length of flexible tubes must be kept as short as possible
□
Flexible tubes should allow condensate to flow back to the humidifier (otherwise, use con-
densate traps for drainage along the connection)
□
The selected location for installation of the Ultrasonic Blower Pack should allow proper routing
of the mist, as described in
"Remote Ultrasonic Blower Pack Installation"
.
Electrical Connection
□
Power supply meet the voltage and current requirements shown on the specification label?
Refer to
"Model Designation" on page 12
.
□
All cables fastened securely?
□
All cables free of tension and pass through any applicable cable glands or grommets?
□
Electrical installation meet the applicable national and local codes?
□
All door panels closed and fastened securely