iii
Appendix-A
Nortec RS
2596995_0_EN_1905
2.3 Optional Accessories
a. Refer to ‘Option schedule’
PART 3 - EXCECUTION
3.1 Installation:
a. Install humidifiers per manufacturers’ instructions.
b. Install with required clearance for service and maintenance.
3.2 Accessories:
a. Install accessories in accordance with manufacturer’s recommendations.
3.3 Commissioning:
a. Start-up of humidifier to be by factory trained technician.
A.2
Blank Schedule
A blank schedule is included on the following page for your convenience.