Suspension mounting
Suspending the Smoke Screen is achieved using a ‘Suspension Kit’ comprising a length of unistrut, two sections
of threaded bar and fixings.
Suspension Kit Contents
(all M8)
Unistrut 1 x 1 metre
Threaded bar 2 x 1 metre
Fixings:
1 x ceiling hole surround
2 x drop-in anchors
6 x full nuts
4 x 25mm washers
2 x 38mm washers
2 x channel nuts
Prepare the Smoke Screen by fitting
the angle brackets. Fix the required
length of M8 threaded bar to the
bracket using 4 x nuts and 4 x 25mm
washers.
Fix the unistrut into place. There are
a range of fixings to accommodate
concrete ceiling, girders etc. if in
doubt contact the fixing supplier.
Attach the threaded bar to the
unistrut using the channel nuts,
38mm washers and M8 nuts. Once
this is done the Smoke Screen can
be lifted into position and the set
screws tightened as above
.
Any fine adjustments can be made
at this stage as the nuts and the
threaded bar will take the weight of
the Smoke Screen.
The final assembly viewed ‘through
the ceiling’ is in the photo. Any hole
made in the ceiling below can be
made good with a cosmetic hole
surround.