background image

 

14 

 

 
 
 

 

ITEM

 

NAME

 

FUNCTION

 

VOLTAGE

 Adjust Knob 

Adjust the digital voltage set point in the tester. 
Press the voltage knob to display the voltage set point. This setting will blink for a few seconds on the front meter. 
Turn Clockwise to increase the setting Voltage Setting Point before pressing 

CHARGE

 button.

 

POLARITY

 switch 

The polarity switch only operates when the 

CHARGE 

indicator is lit, i.e. the output is not charged.  The polarity of 

the  output  waveform  can  be  changed  by  pressing  the 

POLARITY

  switch  on  the  front  panel.  Press  this  switch  to 

toggle  the  output  polarity  from  Normal  to  Reverse.  The  polarity  is  Normal when the 

NOR

 indicator  is lit.  In this 

case, the High Voltage will appear on the 

OUTPUT

 (red lead) as a positive pulse relative to the 

RETURN

 (black 

lead).  When the polarity switch is in the Reverse position (

REV

 indicator is lit), the High voltage will appear on the 

OUTPUT

 (red lead) as a negative pulse relative to the 

RETURN

 (black lead).  

 

NOR REV 

indicator 

Indicates the state of the Output Polarity switch.  

NOR

 indicate Normal position, 

REV

 indicates Reverse position. 

CHARGE

 switch 

Press  this  switch  to  begin  charging  the  impulse  storage  capacitor.    The 

CHARGE

  indicator  will  turn  off  after  the 

CHARGE

 switch is pressed, and the 

TRIGGER

 indicator will turn on. The voltage on the capacitor will appear on 

the voltage meter, Item 8.  This voltage will appear across the output leads when the 

TRIGGER

 switch is pressed.  

Note that the 

POLARITY

 switch is prevented from operating after the 

CHARGE

 switch has been pressed. 

CHARGE

 indicator 

This  Yellow  indicator  is  lit  to show that pressing the 

CHARGE

 switch is the next  logical step  in a test sequence.  

Pressing the Charge switch causes the 

CHARGE

 indicator to go out. 

TRIGGER

 switch 

Press this switch (after pressing the 

CHARGE

 switch to charge the storage capacitor) to trigger the output impulse 

waveform.  The impulse waveform will appear across the output leads. 

TRIGGER

 indicator 

This Red indicator is lit to show that pressing the 

TRIGGER

 switch is the next logical step in a test sequence.  This 

indicator  will  turn  on  after  the 

CHARGE

  switch  is  pressed,  and  will  remain  on  until  the 

TRIGGER

  switch  is 

pressed.  Pressing the 

TRIGGER

 switch causes the 

TRIGGER

 indicator to go out. 

VOLTAGE

 meter 

Displays the output voltage set point.  This voltage is the open-circuit peak voltage that will appear across the output 
leads when the trigger button is pressed.  The voltage reading will increase from zero to the voltage set point when 
the Charge switch is pressed.  Note that the Voltage meter may indicate that some residual voltage is present on the 
main  storage  capacitor,  even  when  the  tester  is  first  turned  ON.    This  is  due  to  inherent  charging  of  the  internal 
capacitors.  Pressing the 

TRIGGER

 switch will discharge the capacitors (be sure not to touch the output and return 

leads when pressing the trigger switch).  

OUTPUT 

cable 

This cable includes both the 

OUTPUT

 (red) and 

RETURN

 (black) test leads. The provided large alligator clips may 

optionally  be  connected  to  the  ends  of  the  test  leads.    These  test  leads  should  not  be  touched  when  a  hazardous 
voltage is indicated on the 

VOLTAGE

 meter. 

 

Table 1.  Controls, Indicators, Connectors – MegaPulse 1.2x50-16PF PV Front Panel 

Summary of Contents for MegaPulse

Page 1: ...MegaPulse IMPULSE TESTER 1 2x50 16PF PV Instruction Manual...

Page 2: ...gn and ergonomic front panel and represents the latest in high voltage impulse testing To fully appreciate all the features of your new instrument we suggest that you take a few moments to review this...

Page 3: ...3...

Page 4: ...Testing Area 6 Safety Techniques 7 Using the MegaPulse Impulse Tester 7 Introduction 9 Operation 11 Setting up your Tester 11 AC Line Voltage Requirements 11 Fuse Replacement 12 Front and Rear Panel...

Page 5: ...5...

Page 6: ...re that high voltage is adept and creative at completing a path to ground Instructions should include a warning against any metal jewelry Operators should not allow others in the testing area especial...

Page 7: ...er test from the MegaPulse until the front panel meter reads a safe level 40 volts or less is generally considered a safe level Pressing the TRIGGER button before disconnecting main power or turning t...

Page 8: ...5 Ohms and the MegaPulse is capable of delivering thousands of Amps of current into a short circuit While the MegaPulse can withstand a short circuit at the output terminals it should NOT be used in t...

Page 9: ...Discharge progress is shown on the front panel meter Your tester is warranted for a period of one year upon shipment of the instrument to the original purchaser Specifications Output Peak 800V 16kV To...

Page 10: ...follow test sequences varying test voltage and time between tests and keep a record with test information Compatible with Windows 32bit platform 220 230 or 240 If a different line voltage is desired...

Page 11: ...e use the original shipping container If the original shipping container is not available be sure that adequate protection is provided to prevent damage during shipment We recommend that the instrumen...

Page 12: ...h to the O or off position 2 Unplug the instrument from the source of supply 3 Remove the power inlet cord from the instrument 4 Using a small screwdriver pry open the fuse holder door 5 Replace the f...

Page 13: ...13 Figure 3 Controls Indicators Connectors MegaPulse 1 2x50 16PF PV Front Panel...

Page 14: ...been pressed 5 CHARGE indicator This Yellow indicator is lit to show that pressing the CHARGE switch is the next logical step in a test sequence Pressing the Charge switch causes the CHARGE indicator...

Page 15: ...ied cordset to connect the MegaPulse tester to appropriate source of supply Fuse holder provides access for Fuse replacement and the Power Switch is used to turn the tester ON and OFF 2 Fuse replaceme...

Page 16: ...setup it is possible to see very large common mode noise which can be mis interpreted as high frequency noise on the front edge of the impulse waveform Figure 5 shows a test setup to measure common m...

Page 17: ...17 Figure 5 Common mode noise measurement setup Figure 6 Common mode noise Figure 7 Common mode noise superimposed on the output waveform...

Page 18: ...nds on the front meter Turn Clockwise to increase the setting Voltage Setting Point 7 Push the yellow CHARGE button Verify the red TRIGGER indicator is now lit 8 After the front panel meter indicates...

Page 19: ...voltage is present on the main storage capacitor even when the tester is first turned ON This is due to inherent charging of the internal capacitors Pressing the TRIGGER switch will discharge the cap...

Page 20: ...n Information The Megapulse 1 2x50 16PF PV has been fully calibrated at the factory in accordance to our published specifications It is recommended that you have this instrument re calibrated and safe...

Reviews: