background image

12 

 

Section 4 

Initial Checkout Procedure 

 

The following procedure will verify that the MegaPulse Capacitor series A PF tester is working 
correctly.  We  recommend  that  this  procedure  be  conducted  periodically  to  ensure  proper 
operation of the tester.  The following items are needed to conduct this procedure: A measuring 
instrument  to  monitor  the  output  waveform.  Always  ensure  that  the  measuring  instrument 
(usually an oscilloscope with a high-voltage probe) is rated for the voltage involved, and that the 
frequency response of the instrument and probe are capable of measuring the output waveform of 
the  MegaPulse  Capacitor  series  A  PF  tester.    A  measuring  instrument  or  probe  with  a  low 
frequency response will result in erroneous readings that could be mis-read.  

  

CAUTION 

High voltage generated by the MegaPulse tester is exposed during this test. A risk of 
shock exists.  Exercise care when using the MegaPulse tester. 

 

1. 

Connect the tester to a proper source of supply using the included 18 AWG power supply 

cord.    Make  sure  that  the  front  panel 

VOLTAGE

  adjust  knob  is  turned  fully 

counterclockwise.  

2.   Plug the Output and Return test leads into the jacks on the front panel. 
3. 

Select the desired capacitance load on the front panel. 

3. 

Connect the ends of the test leads to a capacitor load of the range selected on the front panel 

knob, plug your high voltage oscilloscope probe to the output leads as well.  Note that the 

RETURN 

lead is referenced to the chassis ground of the tester.  

4. 

Turn the Tester on. 

5. 

Note that the Voltage meter may indicate that some residual voltage is present on the main 

storage capacitor, even when the tester is first turned ON.  This is due to inherent charging 
of the internal capacitors.  Pressing the 

TRIGGER

 switch will discharge the capacitors (be 

sure not to touch the output and return leads when pressing the trigger switch). 

6. 

Push the yellow 

CHARGE

 button.  Verify the red 

TRIGGER

 indicator is now lit.   

7. 

Adjust the 

VOLTAGE

 knob so that the front panel LED display is reading a voltage that is 

suitable for the measuring instrument that is being used.  Push the red 

TRIGGER

 button, 

and view the resulting impulse waveform on the measuring instrument. 

8. 

Note  that  the  peak  amplitude  of  the  measured  output  waveform  is  proportional  to  the 

voltage  that  is  read  of  the  front  panel  of  the  MegaPulse,  but  it  will  always  be  somewhat 
lower.  This is because the meter on the MegaPulse is measuring the voltage on the main 
impulse  storage  capacitor.  This voltage will intentionally dissipate to some extent before 
reaching the output leads. 

9. 

Adjust  the 

VOLTAGE 

knob  fully  counterclockwise,  to  the  minimum  position.    Turn  the 

rear-panel power switch OFF. 

 

 

 

 

 

Summary of Contents for MegaPulse Capacitor A PF Series

Page 1: ...MegaPulse IMPULSE TESTER Capacitor series A PF Instruction Manual...

Page 2: ...ign and ergonomic front panel and represents the latest in high voltage impulse testing To fully appreciate all the features of your new instrument we suggest that you take a few moments to review thi...

Page 3: ......

Page 4: ...Megapulse Capacitor series A PF Specifications 7 Front and Rear Panel Features 8 Figure 1 Controls Indicators Connectors MegaPulse Capacitor series A PF Front Panel 8 Table 1 Controls Indicators Conn...

Page 5: ...1...

Page 6: ...re that high voltage is adept and creative at completing a path to ground Instructions should include a warning against any metal jewelry Operators should not allow others in the testing area especial...

Page 7: ...d be set up to the left and in front of the equipment under test The equipment under test should be connected to the MegaPulse tester and then left alone by the operator After the operator is clear of...

Page 8: ...s rated for the voltage involved and that the frequency response of the instrument and probe are capable of measuring the output waveform of the MegaPulse Impulse Tester A measuring instrument or prob...

Page 9: ...F 1 User Manual 1 High Voltage Test Lead Red 00 HVL7R 3 feet 1 High Voltage Test Lead Black 00 HVL7B 3 feet 1 18 AWG AC Power Cord 70 101 1 TestMinder Optional User Manual 1 Software CD Megapulse Test...

Page 10: ...l test house are regarded as meeting this requirement Fuse Replacement There is a user replaceable fuse F1 located on the rear panel of the instrument It is located behind a door in the Power Inlet Po...

Page 11: ...point adjusted by frontal VOLTAGE knob or by PC optional Polarity Control Positive only Voltage Display 4 Digit LED Display Voltage Meter resolution 5V Duty Cycle 1 pulse every 10 seconds Line Voltage...

Page 12: ...se of its controls indicators and connectors The front panel features of the MegaPulse are shown in Figure 1 and described in Table 1 The rear panel features of the MegaPulse are shown in Figure 2 and...

Page 13: ...ross the output leads 7 TRIGGER indicator This Red indicator is lit to show that the tester can be trigger TRIGGER indicator is lit for 2 minutes after the CHARGE button is pressed TRIGGER indicator w...

Page 14: ...d to the chassis of the MegaPulse and is referenced to earth ground as long as the MegaPulse is properly grounded Even though this jack is referenced to ground it should be treated as hazardous whenev...

Page 15: ...d OFF 2 Fuse replacement warning Rating of power supply Specifies replacement fuse and required supply voltage 3 RS 232 Interface Optional Allow the communication between the tester and computer inter...

Page 16: ...ect the ends of the test leads to a capacitor load of the range selected on the front panel knob plug your high voltage oscilloscope probe to the output leads as well Note that the RETURN lead is refe...

Page 17: ...ce West USA is available Phone 800 748 6224 Hours 8 30 AM 4 30 PM Pacific Time Also available on our web site at www compwest com Contact Compliance West USA 650 Gateway Center Way Suite D San Diego C...

Page 18: ...ll be corrected at no charge Mail the instrument post paid to the manufacturer Dated proof of purchase is required for all in warranty repairs The manufacturer is also available for calibration and or...

Page 19: ...ation procedure must be performed by qualified personnel for more information contact Compliance West USA Voltage Stop Disable Keyboard Enable by Keyboard If the MegaPulse Capacitor series A PF tester...

Reviews: