2
Checkout/Calibration Procedure Rev. 1.3
Compliance West USA LCT-601
Date: _______ Serial Number: __________
Checkout Procedure: can be done periodically to verify correct switch operation
Note: The wide parallel slot is the neutral. Switches are numbered 1-4 from the top down.
1.
Switches 1-4 in the left position. Measuring from plug to receptacle on the cords:
a.
Neutral to Neutral: 0-0.5 ohms: ________
b.
Hot to Hot: 0-0.5 ohms: _______
c.
Hot to Neutral: open:
?
d.
Neutral to Hot: open:
?
e.
Ground to Ground: 0-0.5 ohms: _______
f.
Leakage Banana Jack to Leakage Banana Jack: 10 kohm
?
5%: _______
2.
Switches 1, 2 and 3 in the left position. Switch 4 in right (Reverse Polarity) position. Measuring
from plug to receptacle on the cords:
a.
Neutral to Neutral: open:
?
b.
Hot to Hot: open:
?
c.
Hot to Neutral: 0-0.5 ohms: _______
d.
Neutral to Hot: 0-0.5 ohms: _______
e.
Ground to Ground: 0-0.5 ohms: _______
3.
Switches 1, 2 and 4 in left position. Switch 3 in right (Neutral Open) position.
a.
Neutral to Neutral: open:
?
b.
Hot to Hot: 0-0.5 ohms: _____
c.
Hot to Neutral: open:
?
d.
Neutral to Hot: open:
?
e.
Ground to Ground: 0-0.5 ohms: _______
4.
Switches 1, 3 and 4 in left position: Switch 2 in right (Earth - Chassis open) position.
a)
Neutral to Neutral: 0-0.5 ohms: _______
b)
Hot to Hot: 0-0.5 ohms: _______
c)
Neutral to Hot: open:
?
d)
Hot to Neutral: open:
?
e)
Ground to Ground: 1kohm
?
10% (shunted with 15nF): _______
f)
Leakage Banana Jack to Leakage Banana Jack: 11 kohm
?
5%: _______
Summary of Contents for LCT-601
Page 1: ...LCT 601 NFPA 99 Leakage Current Tester Instruction Manual COMPLIANCE WESTUSA...
Page 3: ...ii Rev 1 1 May 20 2005...
Page 15: ......
Page 25: ......