3
Table of Contents
An Introduction to Dielectric Withstand Testing with the HT-2800P ........................................................4
Safety Precautions ........................................................................................................................4
Test Personnel................................................................................................................4
Testing Area...................................................................................................................4
Safety Techniques ..........................................................................................................5
Using the HT-2800P Dielectric Withstand Tester........................................................................5
Ground Check ................................................................................................................5
Ground Check Failures ....................................................................................5
Defeating the Ground Check ...........................................................................6
Leakage Test ..................................................................................................................6
Sporadic Leakage Current Failures..................................................................7
High Voltage Dielectric Withstand Test ........................................................................7
High Voltage Dielectric Withstand Test Failures ............................................8
High Voltage Discharge...................................................................................8
Testing Equipment with non-Standard Plugs or Pigtail Operation.................................8
Introduction and Specifications ..................................................................................................................9
Introduction ..................................................................................................................................8
Specifications ...............................................................................................................................9
Operation ....................................................................................................................................................11
Setting up your Tester ..................................................................................................................11
AC Line Voltage Requirements....................................................................................................11
Fuse Replacement.........................................................................................................................11
Front and Rear Panel Features......................................................................................................11
Initial Checkout Procedure...........................................................................................................16
Setting up the HT-2800P for Production Line Testing.................................................................17
Factory Settings..............................................................................................................17
Display of Leakage Limit and Duration settings............................................................17
Adjustment of the Leakage Current Level .....................................................................18
Adjustment of the High Voltage Ramp Time.................................................................18
Adjustment of the High Voltage Level ..........................................................................18
Adjustment of the High Voltage Test Duration..............................................................19
Setting the Ground Check Switch ..................................................................................19
Operating Techniques ..................................................................................................................19
Daily Operation Test......................................................................................................20
Testing ...........................................................................................................................20
Test Verification procedure when using the HTT-1 function checker:............20
Test Verification procedure when NOT using the HTT-1 function
checker:............................................................................................................20
Test results .....................................................................................................................21
Hipot Pass........................................................................................................21
Red LED/Buzzer..............................................................................................21
Technical Assistance ..................................................................................................................................22
Maintenance and Calibration ......................................................................................................................24
Introduction ..................................................................................................................................24
Service Information......................................................................................................................24
General Maintenance....................................................................................................................24
Interior Access ...............................................................................................................24
Calibration Access ...........................................................................................25
Cleaning .........................................................................................................................25
Calibration Procedure...................................................................................................................25
Voltage Calibration Adjustment.....................................................................................25
Continuity Calibration Adjustment ................................................................................26
Summary of Contents for HT-2800P
Page 2: ......
Page 4: ...2 ...
Page 14: ...11 Figure 2 Controls Indicators Connectors Model HT 2800P Front Panel ...
Page 16: ...13 Figure 3 Controls Indicators Connectors Model HT 2800P Rear Panel ...
Page 18: ...15 ...
Page 26: ...23 ...