CAUTION:
High voltage is generated by the HT-2800P. Although the chassis of the
equipment under test is grounded by the HT-2800P, a risk of shock exists.
Exercise care when using the HT-2800P.
Daily Operation Test
The operation of the HT-2800P should be audited daily by conducting the tests described
in the
Initial Checkout Procedure
section of this Manual. Compliance West also offers the
model HTT-1, which can be used to quickly verify the operation of your HT-2800P. Contact the
factory for details.
Testing
This section describes how the HT-2800P is used to conduct a hipot test. Before
continuing, we recommend that you read Section 1, "An Introduction to Dielectric Withstand
Testing with the HT-2800P". It contains valuable safety, operation, and test result evaluation
information which can help you conduct the test safely and correctly. The test can be stopped
immediately at any time by pressing the red
RESET
button on the front panel.
Test Verification procedure when using the HTT-1 function checker:
1.
Connect the HT-2800P to a correctly rated source of supply and turn the power switch to
the I or ON position. Push the
RESET
button. The yellow
TEST
indicator should light,
indicating that the HT-2800P is ready to test.
2.
Connect HTT-1 to the HT-2800P tester using the cables supplied with the HTT-1.
3.
Set all three switches on the HTT-1 to ‘PASS’.
4.
Run a test with the HT-2800P and verify passing result on the HT-2800P.
5.
Set the
Ground
switch on the HTT-1 to ‘FAIL’; set both other switches to ‘PASS’.
6.
Run a test with the HT-2800P and verify
Ground Open
failure on the HT-2800P.
7.
Set
Leakage
switch on the HTT-1 to ‘FAIL’; set both other switches to ‘PASS’.
8.
Run a test with the HT-2800P and verify
Excess Leakage
failure on the HT-2800P.
9.
Set
Hipot
switch on the HTT-1 to ‘FAIL’; set both other switches to ‘PASS’.
10.
Run a test with the HT-2800P and confirm high voltage breakdown by watching for spark
in Arc Detect window of HTT-1; verify
Hipot
Fail
failure on the HT-2800P.
Test Verification procedure when NOT using the HTT-1 function checker:
1.
Connect the HT-2800P to a correctly rated source of supply and turn the power switch to
the I or ON position. Push the
RESET
button. The yellow
TEST
indicator should light,
indicating that the HT-2800P is ready to test.
2.
Plug the black test lead into the
Return
receptacle on the front panel of the HT-2800P.
3.
Plug the power supply cord of the equipment being tested into the
Device
receptacle on the
front panel of the HT-2800P.
4.
Connect the alligator clip end of the black return lead to an exposed metal part on the
chassis of the equipment to be tested.
5.
Make sure the power switch on the equipment being tested is in the 1 or ON position.
6.
Push the
TEST
button. The HT-2800P will:
Summary of Contents for HT-2800P
Page 2: ......
Page 4: ...2 ...
Page 14: ...11 Figure 2 Controls Indicators Connectors Model HT 2800P Front Panel ...
Page 16: ...13 Figure 3 Controls Indicators Connectors Model HT 2800P Rear Panel ...
Page 18: ...15 ...
Page 26: ...23 ...