17
Note: The following procedure tests the "Hipot Breakdown" circuit of the HT-
2800P and involves high voltage. The only exposed parts during this test are at
ground potential. However, the voltage inside the High Voltage Device socket
may be as much as 2800 volts. Proceed with caution.
21. Make sure the black lead is still plugged into the
RETURN
jack on the front panel.
22. Make sure the
Ground Check
switch on the rear panel is in the Off position.
23. Remove the hookup wire from the
DEVICE
receptacle, but leave it connected to the clip of
the black lead. Carefully hold the black lead by its insulated alligator clip boot.
24. Push the red
RESET
button, then the yellow
TEST
button. After the
Full Voltage
LED
lights, and before the
Hipot Pass
LED has lit, insert the other end of the hookup wire into
one of the vertical parallel slots in the High Voltage Device receptacle on the front panel.
25. The test should immediately terminate with a buzzer. The
Ground OK
,
Ground Open
,
Full Voltage
,
Hipot Fail
and red
RESET
LED’s should be lit.
Note: Depending on how the connection between the High Voltage Test Receptacle and
the hookup wire is made, the
Excess Leakage
LED may light, and in some instances, the
Ground OK
LED may extinguish.
Passage of these tests indicates that the HT-2800P is functioning properly and that it is
safe to use. If the results of the performance test are not in accordance with the above, service is
required. Remove the HT-2800P from service and contact Compliance West USA, Inc. for
servicing information.
Setting up the HT-2800P for Production Line Testing
This section describes procedures for setting the Pass/Fail leakage current level, high
voltage ramp time, high voltage level, and high voltage test time. The HT-2800P is calibrated as
shown below at the factory to be usable without adjustment in the majority of applications. If the
factory settings are acceptable, you may skip this section.
Factory Settings
The unit is configured as shown when shipped from Compliance West USA:
Leakage Current Level:
2 mA
High Voltage Ramp Time:
1 second
High Voltage Level:
1700 volts
High Voltage Test Time:
2 seconds
Adjustment of the various settings are shown below.
CAUTION
High voltage is generated by the HT-2800P. Although the chassis of the
equipment under test is grounded by the HT-2800P, a risk of shock exists.
Exercise care when using the HT-2800P.
NOTE
These adjustment procedures set the use parameters of the HT-2800P. They do not
take the place of the annual calibration required by the safety agencies.
Summary of Contents for HT-2800P
Page 2: ......
Page 4: ...2 ...
Page 14: ...11 Figure 2 Controls Indicators Connectors Model HT 2800P Front Panel ...
Page 16: ...13 Figure 3 Controls Indicators Connectors Model HT 2800P Rear Panel ...
Page 18: ...15 ...
Page 26: ...23 ...