8
ITEM
NO.
NAME
FUNCTION
1
HIPOT
When ON, Dielectric breakdown detect will be activated.
When in DEFEAT position, test will continue regardless of a dielectric breakdown, but it can be stopped by the excess
leakage limit. NOTE: The RAMP switch, and TIMER switch must also be in the DEFEAT position, otherwise the buzzer
will sound. The test will continue only as long as the TEST button is pressed. Minimum test time is approximately one
second.
2
TIMER
When ON, test duration is set by TIMER ADJUST, Item 5.
When in DEFEAT position, testing continues only as long at TEST button is pressed. Minimum test time is one second.
NOTE: TIMER Switch position must be DEFEAT when HIPOT Switch is in the DEFEAT position.
3
RAMP
When ON, Voltage ramp up time is controlled by RAMP ADJUST potentiometer, Item 6.
When in DEFEAT position, high voltage is applied immediately when TEST button is pressed. NOTE: RAMP switch
position must be DEFEAT when HIPOT switch is in the DEFEAT position.
4
LEAKAGE ADJUST
Adjusts the shutdown point for the Leakage Current Test. For details see “Leakage Current Adjust.”
5
TIMER ADJUST
Adjusts the test duration. For details see “Test Time Adjust”.
6
RAMP ADJUST
Adjusts the delay between time TEST button is pushed and time desired output voltage is attained. For details see
“Ramp Time Adjust”. For no delay, DEFEAT Ramp Time Switch, Item 3.
7
RESET Button
When lit, indicates that the HT-20KVPac is unarmed. When the RESET button is pressed, the TEST switch is lit.
PRESSING THE RESET BUTTON AT ANY TIME IMMEDIATELY STOPS TESTING.
8
TEST Button
When lit, indicates the HT-20KVPac is ready to test; press to begin testing.
9
VOLTAGE METER
Connected to the output. Reads actual output voltage. Adjust meter range with VOLTAGE ADJUST Knob, Item 17.
10
HIPOT PASS LED
Indicates test conclusion with satisfactory results.
11
FULL VOLTAGE LED
Lights when output voltage has ramped up. Test time starts when this indicator lights.
12
HIPOT FAIL LED
Lights when arcing or insulation flashover has occurred.
13
EXCESS LEAKAGE LED
Actual leakage current has exceeded the shutdown point set with Shutdown Limit Potentiometer, Item 4.
14
CURRENT METER
Connected to the output. Read the current flowing through the return lead of the HT-20KVPac during the test.
15
AC OUTPUT Receptacle
Connect high voltage lead here to conduct an AC test.
16
RETURN Receptacle
At chassis ground reference level. Connect black return lead here.
17
VOLTAGE ADJUST Knob
Voltage is continuously adjustable during testing with this knob.
18
AC POWER Switch
Energizes the HT-20KVPac.
19
FUSE
Mains fuse. Replace only with type, and rating of fuse specified on the front panel label. Turn off power switch, Item
18, before servicing fuse.
Table 4-2. Front Panel Control, Indicators and Connectors