II. Installation of the Mechanism
•
You have to install the mechanism (roller shaft + fixation parts) before the
space around the pool is filled up with a sand-concrete combination .
•
On the following pages you find an exploded view of the different parts
together with a detailed part list (II.1)
•
To install the mechanism follow the installation sequence (II.2)
Summary of Contents for Rollo Cover
Page 1: ...CompassPools Rollo Cover Installation Manual ...
Page 6: ...II 1 Exploded view of the different parts of the mechanism ...
Page 22: ...III 1 Installation sequence Smooth the pool wall Inject enough silicone type INNOTEC ...
Page 26: ...IV 1 Technical drawing of the SS frame Earth connection Regulating bracket ...
Page 54: ...VII 1 Electrical preparations VII 1 Electrical preparations Motor cable is always 10m long ...