IV.2 Installation sequence
•
On the front of the SS frame
you put the coping stones
•
At the back of the SS frame
you put wooden panels/grates
to close the cover pit.
•
The wooden panels can easily
be removed to clean the pit or
to do service.
•
Make sure the corner coping
stones are glued to the frame
with silicone so they can be
removed in case the frame has
to be taken out of the pool
Corner coping stones
Summary of Contents for Rollo Cover
Page 1: ...CompassPools Rollo Cover Installation Manual ...
Page 6: ...II 1 Exploded view of the different parts of the mechanism ...
Page 22: ...III 1 Installation sequence Smooth the pool wall Inject enough silicone type INNOTEC ...
Page 26: ...IV 1 Technical drawing of the SS frame Earth connection Regulating bracket ...
Page 54: ...VII 1 Electrical preparations VII 1 Electrical preparations Motor cable is always 10m long ...