
Contents
List of Figures
ProLiant BL e-Class standard rack mounting hardware ........................................... 2-8
Inserting the interconnect tray and engaging the interconnect tray levers................ 3-4
Measuring with the ProLiant BL e-Class rack template ........................................... 3-6
Marking the rack for ProLiant BL e-Class system installation................................. 3-7
of the rack rail............................................................................... 3-9
Inserting the front of the rack rail and engaging the locking gear .......................... 3-10
enclosure into the rack ...................................................................... 3-12
Removing a thumbscrew and hexagonal washer .................................................... 3-13
Replacing a thumbscrew, spring, and hexagonal washer........................................ 3-14
ProLiant BL10e server blade DIMM socket keys .................................................. 3-31
ProLiant BL10e G2 server blade DIMM socket keys............................................. 3-32
HP ProLiant BL e-Class System Setup and Installation Guide
vii
HP CONFIDENTIAL
Writer: Karen Hale File Name: a-frnt.doc
Codename: MacDuff Part Number: 249068-003 Last Saved On: 5/21/03 2:58 PM