The Community Loft
28
Robin’s loft
Checklist in order of installation:
8 long and 2 short posts?
8 arch supports as shown in Floor Plan?
4 single arches
and 5 single solid panels in
bottom layer?
1 single and 1 double arch on second level
to hold structure together?
All panels, arches, and
arch supports
held
properly with connectors?
Floor Plan - First Level
8
Arch Supports
1
Arch Support
Arch Support