Page 2 of 28
© 2019 CommScope, Inc. All Rights Reserved
4.
General product description
This enclosure is deployed in the distribution and drop part of the spliced fiber network. It is designed to allow
reconfiguration in the field, meaning the enclosure can be re-entered to add new cables as required.
Environmental conditions
The enclosure is designed to meet
20kPa and 2 m water head
sealing performance compliant with prEN50411-2-10. It is
suitable for underground (manhole, handhole), ground level (pedestal) and aerial use.
The TENIO fiber enclosure is a modular butt splice enclosure fully compatible with
G.652.D SM fiber
. Fiber and cable
technology independent, it can be configured to meet specific requirements in terms of maximum splices, loop storage,
optical device storage, and cable diameter.
Two sizes are available, B6 and C6/C6H, to allow this flexibility (see dimensions on the next page).
Contents
1.
About this installation instruction ........................................ 1
2.
Warnings and caution ............................................................ 1
3.
List of acronyms and abbreviations ..................................... 1
4.
General product description ................................................. 2
4.1.
Sizes and dimensions ................................................................................ 2
4.2.
Overview of the functionalities (building blocks) of the enclosure
3
4.2.1. Towers ............................................................................................................ 4
4.2.2. Trays ............................................................................................................... 4
4.2.3. FAS .................................................................................................................. 4
4.2.4.
Passive optical components storage ..................................................... 4
4.2.5.
Tube/subunit holder
................................................................................... 4
4.2.6.
CTU holder area
.......................................................................................... 4
4.2.7.
Cable seal
.................................................................................................... 4
4.2.8.
Loop storage area ...................................................................................... 4
4.2.9.
Fiber guidance pin and wedge
............................................................... 4
5.
Kit content ............................................................................... 5
5.1.
Principle parts .............................................................................................. 5
5.2.
Customized parts ....................................................................................... 5
5.2.1.
Cable seal (SKG)
.......................................................................................... 5
5.2.2. Trays ...............................................................................................................
6
5.2.3.
CTU’s
..............................................................................................................
6
6. Accessories .............................................................................. 6
6.1.
Mounting bracket
.......................................................................................
6
6.2.
External cable fixation
................................................................................
6
7.
Tools required ......................................................................... 6
8.
Prepare organizer ................................................................... 7
8.1.
Open enclosure .......................................................................................... 7
8.2.
Install splice trays ........................................................................................ 8
8.3.
Install patch tray .......................................................................................... 8
8.4.
Fiber guidance pin and wedge
............................................................... 8
8.5.
Install POC (Passive Optical Components)
...........................................8
9.
Prepare cable .......................................................................... 9
9.1.
Loop cable
................................................................................................... 9
9.2.
Drop cable (stub cable)
............................................................................. 9
9.3.
Install CTU on cable
................................................................................... 9
9.3.1.
CTU-L - central strength member
..........................................................9
9.3.2.
CTU-L - dual strength member
............................................................11
9.3.3.
CTU-L - aramid yarn
................................................................................11
9.3.4.
CTU-S - aramid yarn
................................................................................12
10.
Install gel seal segments ...................................................... 13
10.1.
Install side seal segments .......................................................................13
10.2.
Install SKG for CTU-L
................................................................................14
10.3.
Install SKG for CTU-S
...............................................................................14
10.4.
Install dummy SKG ....................................................................................15
11.
Install looped feeder cable .................................................. 15
11.1.
Secure cable to enclosure
......................................................................15
11.2.
Store loop ...................................................................................................
16
11.3.
Tube/subunit holder
.................................................................................
16
12.
Install drop cable ................................................................. 18
13.
Splice application ................................................................. 19
13.1.
Routing to tray ..........................................................................................19
13.2.
Routing on tray .........................................................................................20
14.
Patch application .................................................................. 20
15.
Close and seal enclosure ...................................................... 21
16.
External cable fixation
......................................................... 22
17.
Mounting bracket ................................................................. 23
17.1. Dimensions .................................................................................................23
17.2.
Mount the enclosure
...............................................................................23
17.2.1.
Wall mounting ...........................................................................................23
17.2.2.
Pole mounting ...........................................................................................24
17.2.3.
Mount enclosure on the bracket
.........................................................24
17.3.
Open enclosure when using the bracket
............................................24
17.3.1.
Remove dome only ................................................................................24
17.3.2.
Remove dome and base
........................................................................24
18. Re-entry ................................................................................. 25
19. Trade-marks .......................................................................... 25
20.
Contact information ............................................................. 25