Step 4B – G2 Bezel Application
1. Starting at location A (the left-most position), plug a bezel into the bulkhead cutout until it snaps into place,
as shown in figure above.
2. Terminate a fiber pigtail into bezel, color keying as required. Repeat for remaining locations. Bundle all
pigtails together with a suitable device that will not damage the fibers (e.g. twist tie or hook-and- loop strip)
at approximately 1-foot (305mm) increments.
3. Spool fiber bundle into slack fiber management rings in a clock-wise direction as shown.
4. Repeat items 1 through 3 for the next five consecutive bezel locations (locations B through F).
5. Starting at location G (seventh location from the left side), repeat items 1 through 4 for all remaining
locations (locations G through M).
6. Pigtails from locations A through F are to be spooled into the first set of slack fiber management rings (four
rings on the left-hand side of the shelf). Fibers from locations G through M are to be spooled into the second
set of slack fiber management rings (four rings on the right-hand side of the shelf).
Splice tray
Splice wallet
Spool clockwise
through fiber rings
Bulkhead
G2 Bezel
(location A)
G2 Bezel
(location G)
Spool clockwise
through fiber rings