3.7 Factory-Preferred Tie-Down Method
INSTRUCTIONS
IMPORTANT:
These instructions are intended as a guide to securing equipment for
wind-load ratings of “120 MPH sustained wind load” and “3-second, 150 MPH gust.”
While this procedure is not mandatory, the Manufacturer does recommend that
equipment be properly secured in areas where high wind damage may occur.
STEP 1: Before installing, clear pad of any dirt or debris.
IMPORTANT:
The pad must be constructed of industry-approved materials,
and must be thick enough to accommodate the concrete fastener.
STEP 2: Center base pan on pad, ensuring it is level.
STEP 3: Using basepad as a guide, mark spots on concrete where 4 holes will be
drilled (see Figure 3).
STEP 4: Drill four pilot holes in pad, ensuring that the hole is at least 1/4” deeper
than the concrete screw being used.
STEP 5: Center basepan over pre-drilled holes and insert concrete screws.
STEP 6: Tighten concrete screws.
NOTE:
Do not over-tighten the concrete screws. Doing so can weaken the
integrity of the concrete screw and cause it to break.
STEP 7: Finish unit assembly per unit’s installation instructions.
4.0 REFRIGERANT CONNECTIONS
All units are factory charged with Refrigerant 410A. All models are supplied with
service valves. Keep tube ends sealed until connection is to be made to prevent
system contamination.
4.1 Tools Required For Installing & Servicing R-410A Models
Manifold Sets:
-Up to 800 PSIG High side
-Up to 250 PSIG Low Side
-550 PSIG Low Side Retard
Manifold Hoses:
-Service Pressure Rating of 800 PSIG
FIGURE 2
RECOMMENDED ELEVATED INSTALLATION
9
Summary of Contents for PRL-series
Page 52: ...FIGURE 11 WIRING DIAGRAM FOR 2 3 4 TON 19 0 WIRING DIAGRAMS 52 ...
Page 53: ...FIGURE 12 WIRING DIAGRAM FOR 5 TON 53 ...
Page 54: ...54 ...
Page 55: ...55 ...
Page 56: ...56 CM 1108 ...