
Comfortflame.US.com
900577-00_NC
11
INSTALLATION
Continued
PRESSURE TESTING APPLIANCE GAS CONNECTIONS
1. Open equipment shutoff valve (see Figure 11, page 10).
2. Open main gas valve located on or near gas meter for natural gas
or open propane/LP supply tank valve.
3. Make sure control knob of appliance is in the OFF position.
4. Check all joints from equipment shutoff valve to control valve (see
Figure 12 or 13). Apply a noncorrosive leak detection fluid to gas
joints. Bubbles forming show a leak.
5. Correct all leaks at once.
6. Light appliance (see Operation, page 12). Check all other internal
joints for leaks.
7. Turn off appliance (see To Turn Off Gas to Appliance, page 13).
Figure 12 - Checking Gas Joints (Stove Model Shown)
Control Valve Location
Propane/LP
Supply Tank
Equipment Shutoff Valve
Figure 13 - Checking Gas Joints Stove Model Shown)
Gas Meter
Equipment
Shutoff Valve
Control Valve Location
INSTALLING ROD AND SCREEN
1. Insert rod through small rings located at top of screen (see Figure
14).
2. From back of stove, insert rod into hole located inside right front
of stove as shown in Figure 15.
3. Slip left side of rod down into slot on inside left front of stove
(see Figure 15).
Figure 14 - Assembling Rod and Screen
Rod
Rings
Figure 15 - Installing Screen Into Stove (View From Back of
Stove)
Slot on Inside
Left Front of
Stove
Hole on Inside
Right Front of
Stove
Rod with
Screen
Assembled