background image

 

III.  Handling Precautions And Calculations 
 

 Handling Precautions 

The operator of winch in some cases is required for qualifications according to 

applicable laws and ordinances. 

Prior to starting of use, carry out the daily checking without fail, and use after 

confirming the safety of function. 

Don't use exceeding the lead rated. 

The operator of winch must not be apart from the operating position under the 

loading condition. 

Carry out the operation of lifting and lowering after stopping the winch once, and 

avoid the rapid speed operation as far as possible. 

Even in the condition where the rope is feed out at most, the rope must remain by 

five more windings on the drum. 

Record the daily operating time and take into consideration so as to obtain the   

  suitable time for intermediate inspection and arrangement. 

 

 Calculating Head Loads 

 

P: Rope tension 

η

: Sheave coefficient 

θ

: Angle 

W: Load 

μ

: Friction factor 

 

 Calculating Fleet Angle 

 

 The winch should be mounted as close to center and as perpendicular as possible to 

the direction of the line pull. This will keep the wire rope fleet angle centered on the 
drum as small as possible. 

 If the proper fleet angle is not maintained, the wire rope could wind onto one side 

of the drum. This could cause failure of the winch or wire rope, resulting in damage, 
injury or death. 

 Experience has shown that the best wire rope service is obtained when the 

maximum fleet angle is not more than 1.

for smooth drums. 

 The distance from centre of the rope drum till the first rope sheave or roller fairlead 

shall in the ideal case be 19 times the drum width 

 
 
 
 

Summary of Contents for CWL-301L

Page 1: ......

Page 2: ...ed to the drum Don t use unsuitable pulleys or accessories concerned Don t use unsuitable rope in construction strength or having any defects Pay attention to the grounding it provides a path of least...

Page 3: ...D diameter mm 4 5 6 6 5 length M 24 71 30 55 46 Wire rope construction 6 x 19 6 x 19 6 x 19 6 x 19 6 x 19 General Safety Precaution Danger The following environmental conditions may result in the poss...

Page 4: ......

Page 5: ...Rope Replacement Insert the wire rope into the hole of drum and fix it with a P T screw then press the UP button of switch for rotate the drum in the lifting direction Wind the wire rope accurately a...

Page 6: ...s SP 220 a viscosity cSt is 226 14 19 5 at 40 100 Consult your local lubricant distributor on the selection that best fits your climate and application The initial lubricant should be changed after th...

Page 7: ...perating time and take into consideration so as to obtain the suitable time for intermediate inspection and arrangement Calculating Head Loads P Rope tension Sheave coefficient Angle W Load Friction f...

Page 8: ...l To be free from exposure of conductive wire Attaching condition of earth line Visual Existence of abnormalities of connecting wires Control Switch Condition of insulation Measure with 500v insulatio...

Page 9: ...g up of load Condition of rope winding in Visual To be free from irregular winding Condition of feed oil Visual To be not insufficient in feed out Wire Rope Confirming of dead turn of rope Visual Conf...

Page 10: ...ss y Replace clean motor No reaction Considerable voltage down Ascertain the corrective input Overload Reduce load Check voltage Lifting speed to be slow Considerable voltage down Check the section of...

Page 11: ...VI Replacement Parts List CWL 80...

Page 12: ...Replacement Parts List CWL 200...

Page 13: ...CWL 200L...

Page 14: ...Replacement Parts List CWL 301 301L...

Reviews: