- 10 -
3
3
INSTALLATION
The installation of AQUA+VS must be done in a fresh, dry and good aerated place.
WARNING
AQUA+VS must be installed by q
qualified personnel and in compliance with regulations, there
must be a tap above (to exclude the equipment from the water system in case of maintenance
interventions), a non-return valve, water sampling points upstream and downstream of the
device and a socket.
Avoid subjecting the machine to excessive temperature changes that could cause
condensation inside, which can damage the electronic parts.
The instructions and representation that follow are to be considered for typical installations;
specific components may vary depending on the accessories supplied with the machine and
derivation and delivery chosen taps.
CONTROLS TO BE CARRIED OUT BEFORE INSTALLATION
Presence and efficiency of grounding of power line.
Compatibility of the power line with the electrical specifications indicated on the plate on the
back of machine.
Electric cables of the power source circuit of upper than 0.75mm section.
Stability of the network tension (sudden changes in tension of less than 10%).
The machine can be installed horizontal or vertical position.
In vertical position, display and hydraulic connections must lay on the upper side.
In the package, four adhesive feet are supplied.
INSTALLATION
1. drain
2. water inlet
3. Power cable
4. Permeate output
Summary of Contents for AQUA+VS
Page 2: ...2...
Page 24: ...24 A ALLEGATO I Dichiarazione UE di conformit...
Page 26: ...26...
Page 27: ...27 A ALLEGATO III Collegamenti della scheda elettronica...
Page 30: ...2...
Page 47: ...19...
Page 54: ...26...
Page 55: ...27 A ATTACHMENT III WIRING DIAGRAM...
Page 58: ...2...
Page 77: ...21 kontrollieren...
Page 82: ...26...
Page 83: ...27...
Page 84: ...28 A ANLAGE III ASCHL SSE DER ELEKTRONIKKARTE...
Page 86: ......
Page 88: ......
Page 111: ...25 A ANNEXE III Connexions de la carte lectronique...
Page 112: ......