
step 110
27
Remove suction basin (32) and stripping brush (33) and rinse (Fig. 18: Seal strip)
Check chains (35) for correct tension and, if necessary, tighten with chain adjuster
44) (see Chapter 4.6.1 Tightening the chain and Fig. 20: Chain drive /Spraying noz-
zle).
Clean chains (35) and treat with a chain spray.
Check spray nozzles (36) and clean if necessary.
Check glide rails (25) on the right and the left. Replace if showing signs of wear (Fig.
19: Seal strip).
Check sliding elements of the step adjustment device (23 and 24). Replace in case of
wear.
Check seal strip (34) and renew if necessary (Fig. 18: Seal strip).
Figure 20 Collecting container
4.5 Maintenance after 100 service hours
Maintenance work may be carried out by trained personnel only.
Maintenance work in this case should be carried out as after 30 service hours, but
here the chains (35) and chain wheels (37) must be checked for wear and replaced if
required (see Fig. 21: Chain drive / spray nozzle).
38
39
Summary of Contents for step 110
Page 10: ...step 110 10 21 19 1 3 28 23 24 25 29 27 17 20 18 22 16 4 43 45 46 48 47...
Page 32: ...step 110 32 7 Notizen...
Page 33: ......
Page 34: ......
Page 35: ......