6
.
7. Installation and start - Service
TOWER marin
7.1.
Place the brewer unit on a flat, level and waterproof surface.
7.3.
Connect the brewer unit to a
coldwater feed -1/2"R
with connection tube supplied.
NOTE!
The new hose set supplied with the appliance shall be used and that old hose
sets shall not be reused.
Connection to a closable valve is recommended.
Min. water pressure; 2bar (200kPa). Max. water pressure; 8bar (800kPa).
Water supply to the machine is the customer ’s responsibility according to
instruction and advice from the supplier.
In areas with high level lime problem, a descaling filter should be mounted.
7.4. Electrical connection;
The brewer is not reconnectable and may only be installed to the electric supply network
with a voltage that is stated on the brewer and shall be carried out by an Authorized
Electrician.
Recommended: Install a line circuit breaker and a earth fault breaker to the machine.
CAUTION!
Connection to a separate 3 phase only
- Brewer should be connected to 380 V with Zero and ground.
- Use 16 Amp fuses.
IMPORTANT!
Electrical installations must be done of an certificated electrician.
440 V 3 - phase + ground 9000W
Observe!
See page 13-14, Mounting machine -
Service. And how to assemble the
machine.
7.2.
Install and lock machine. See fig, A.
Adjust feets to stabilize machine.
Fig. A
Summary of Contents for TOWER MARIN
Page 1: ...Rev 091123 S_EN MANUAL TOWER Marin 2 x 5 Litre Your retail dealer ...
Page 23: ...16 Exploded V iew Serving Station TOWER 23 40 41 42 50 49 48 43 44 45 46 47 51 52 53 54 ...
Page 24: ...24 17 Electrical diagram 3 x 440VAC ground T ower marin ...
Page 25: ...25 18 Dimension sketch TOWER marin ...
Page 26: ...26 19 Dimension sketch Serving Station TOWER ...