17.
12. Programming. Hardware test - SERVICE
TOWER marin
Hardware test:
Controll of hardware.
1.
Checking all electrical outlets:
(No outgoing
voltage from the electronic-card in 3 seconds).
2.
Control of water, in 3 seconds.
3.
Control left outlet valve, in 3 seconds.
4.
Control right outlet valve, in 3 seconds.
5.
Control heating element, in 3 seconds.
6.
Testing buzzer, in 3 seconds.
7.
Testing temperature in tank, in 3 seconds.
8.
Control of membrane switch
by pushing the
buttons 1, 2, 3, 4, 5, 6.
See fig.
9.
Display shows:
Function of temp. sensor. = L1/L2.
10. To leave programming: Restart machine.
1.
To do a hardware test, rest art machine.
Machine must be in position OFF.
Push buttons 1, 3 left side at the same time
and start machine, position ON.
ON/
OFF
ON
1
4
2
5
3
6
1
4
2
5
3
6
Summary of Contents for TOWER MARIN
Page 1: ...Rev 091123 S_EN MANUAL TOWER Marin 2 x 5 Litre Your retail dealer ...
Page 23: ...16 Exploded V iew Serving Station TOWER 23 40 41 42 50 49 48 43 44 45 46 47 51 52 53 54 ...
Page 24: ...24 17 Electrical diagram 3 x 440VAC ground T ower marin ...
Page 25: ...25 18 Dimension sketch TOWER marin ...
Page 26: ...26 19 Dimension sketch Serving Station TOWER ...