Rev 3 Coffee Crafters -| Assembly and Installation
23
INSTALLING FLEX HOSE
ITEM#
PART#
DESCRIPTION
QTY
1
A9-RBA-0000
ROASTER BODY ASSEMBLY
1
2
A9-CCA-0000
HOOD AND MAST
1
3
A9-BCA-0000
BEAN COOLER ASSEMBLY
1
4
FLEX HOSE A
MAST TO CHAFF COLLECTOR TOP
1
5
FLEX HOSE B
CHAFF COLLECTOR LOWER TO BLOWER
1
6
FLEX HOSE D
BEAN COOLER TO BLOWER
1
1.
Your hardware kit includes a 20’ section of 4” aluminum flex hose and
6 -
4” hose clamps.
2.
Make sure to fully extend the flex hose when cutting your hose sections.
3.
Cut the 3 hose sections to the lengths suit your roaster positioning. Secure each end using the
4” hose clamps provided.
Make sure each hose section is seated completely over the duct
flange before tightening the hose clamp.