Operation Manual SR3
Januar 2018
Page
13
Coffed BDH, ul. Ceramiczna 28, 64-920 Piła PL, tel+48 (67) 214 26 29, www.coffed.pl
4.SSERVICESANDSMAINTENANCES
CheckingSeveryS80ShoursS
S
•
Checking the transmission elements
•
Checking if the flaps and other moving elements are working properly
•
Cleaning and greasing the moving elements
S
S
CheckingSeveryS160ShoursS
S
•
Checking that the emergency stop buttons work properly
•
Controlling the temperature indication elements
•
Visual control of the electrical cabinet
S
S
InstallationScheckS
S
Activities performed by persons with the required qualifications and if the regulations do not
specify exactly the time period, not less often than once a year:
S
S
•
Electrical installation - checking the short circuit loop and insulation resistance of the power
cord
S
S
•
Gas installation - checking the gas system's tightness and correct functioning of the flame
control and ignition system
LubricationSofSmovingSparts
Main bearing should be greased with special temperature resistant grease. After removing
the front cover of the bearing the operator should grease the bearing and then put the cover back
in its place.
S
S