COBRA INSTALLATION AND PROGRAMMING GUIDE
Installing the 6 or 7-Pin IC Core for Manual Key Override
57010-H Page 9 12-19-2005
Installing the 6 or 7-Pin IC Core for Manual Key Override
1) Install the 7-Pin Small-Format IC Core for Manual Key Override:
•
Hold lock in horizontal position.
•
Remove tape (
a
) if present.
•
Push in plug (
b
) until pin (
c
) until it falls out.
•
Remove plug.
•
Insert cylinder control key (
a
) into core (
b
) and turn
clockwise to retract locking pin.
•
Push cylinder core into lock
NOTE: Resistance will be noticeable.
•
Turn key counterclockwise to engage locking pin.
•
Remove key.
Lock is now operational.
Operation:
Either the cylinder plug or the IC core must be installed for the lock to operate. Removal of the core or
plug automatically unlocks the lock. It is recommended that an IC core be installed in case it ever
becomes necessary to unlock the lock using mechanical means.
a
b
c
a
b
NOTE:
6-PIN IC CORE CYLINDERS REQUIRE THAT THE
ADAPTER IS INSTALLED TO MAKE THEM AS LONG
AS A 7-PIN CYLINDER. THE ADAPTER IS
INCLUDED IN THE SCREW PACK. DO NOT INSTALL
THE ADAPTER IN A 7-PIN IC CORE CYLINDER.