![CMP DEL UV-C PRO 100 Installation Instructions & Product Manual Download Page 6](http://html1.mh-extra.com/html/cmp/del-uv-c-pro-100/del-uv-c-pro-100_installation-instructions-and-product-manual_2627507006.webp)
3
2D-3. System Control
• Remote start contacts have been provided for remote ON-OFF operation of the UV-C Pro.
• These should be wired to an external device that closes when the pool pump is ON and opens when it is OFF.
• Failure to use the remote start contacts may result in damage to the unit not covered under warranty.
Figure 2: Remote Start Contact Locations
2E. Plumbing
The UV-C Pro can easily be added into the pool’s plumbing loop. All the components are contained inside the enclosure
so only the water inlet and outlet need to be installed into the pool’s return line.
2E-1. Plumbing the UV-C Pro
• Install in the main return line of the pool immediately after the filter and preferably before the heater.
• Install cleaners such as chlorinators after the UV-C Pro.
• The outlet of the UV-C Pro must be at least 10 feet from the first return of the pool.
• Use the fittings provided in the parts kit to connect the UV-C Pro inlet and outlet to the plumbing.
2. INSTALLATION
Connection Points for
Remote Start Contacts