2
2A. Pool Preparation
To achieve optimal performance from the system, the pool must be as clean as possible to start with.
1. Backwash or clean filters one day before starting the generator.
2. Superchlorinate pool water using a chlorine based shock treatment so the water has a sustained 1-3 ppm free
chlorine level.
3. Test pool chemistry and adjust pH between 7.4 and 7.6. Adjust total alkalinity between 80 and 120 ppm.
4. Run pool filtration continuously for 24 hours prior to starting UV-C Pro.
2B. Location
• Ambient Temp.: 40°F - 110°F (5°C - 43°C)
• Locate the unit indoors or outdoors in a clean area protected from rain and direct sunlight.
• Locate the unit out of reach of sprinklers or drainage spouts. Allow sufficient access for maintenance (2 ft clearance
above and 1 ft around the unit) and all plumbing and electrical hookups. Allow additional clearance in front of the
unit to allow for door swing and lamp service.
2C. Mounting
• The UV-C Pro is shipped with hardware for either floor or wall mounting. Attach the mounting rails in the desired
position (bottom or back of the enclosure) and secure with the screws provided.
• Mount the UV-C Pro securely using appropriate hardware or anchors for the surface and as needed to meet local
building code requirements.
2D. Electrical
Refer to the
IMPORTANT SAFETY INSTRUCTIONS
at the beginning of this manual for important wiring information.
2D-1. Main Power
• Connect the UV-C Pro so that it operates simultaneously with the pool pump.
• An electrical junction box and wires are provided on the left wall of the enclosure for a 1/2” conduit connection.
• Remove the protective plug and install electrical fittings as required to meet local codes.
• Run service wires to the box and connect to provided wiring.
2D-2. Bonding Lug
Connect a solid copper conductor to the bonding lug on the left side of the UV-C Pro to an appropriate earth contact.
(Figure 1)
2. INSTALLATION