background image

12

SECTION 4 Maintenance & Service

4D-2. Installing the UV Lamp

1.  Make sure to only handle the new UV lamp by the ceramic 

ends. Clean the UV lamp with a lint free cloth and rubbing 

alcohol before installation if needed.

2.  Carefully push the UV lamp into the UV lamp retainer until the 

top of the UV lamp is past the tabs on the UV lamp retainer.

3.  Reconnect the UV lamp power connector to the wire harness.

4D-3. Quartz Tube Removal and Cleaning

CAUTION: 

Wear proper eye and skin protection for 

servicing glass components. If broken glass is trapped 

in the pool system, do not operate the pool. Contact a 

service professional to have the glass removed.

NOTE: 

Damage caused by a broken quartz tube is not 

covered under the DEL AOP-S limited warranty.

The UV lamp is housed in a quartz tube. If the quartz tube 

becomes dirty, its ability to transmit rays from the UV lamp will 

be diminished and decrease system performance. The quartz 

tube should be removed from the AOP-S at least once a year 

for inspection and cleaning.

 

1.  Make sure the AOP-S is drained of pool water and has cooled 

before performing maintenance on the quartz tube.

2.  Remove the UV lamp as described in 

Section 4D-1. 

Remove 

the two screws and washers from the top of the UV lamp 

retainer, and pull the UV lamp retainer out of the quartz tube 

adapter.

NOTE: 

Any remaining water in the AOP-S, or the plumbing 

system above the level of the AOP-S, will drain when the UV 

lamp retainer is removed.

3.  Grasp the inside of the quartz tube and pull it out of the 

housing. Make sure the sealing o-ring does not get lost during 

quartz tube removal.

4.  Inspect the quartz tube for cracks and replace if cracks are 

found. Inspect the sealing o-ring for nicks or hardness and 

replace if necessary.

5.  Clean the quartz tube exterior with a mild solution of muriatic 

acid and water in a ratio of four parts water to one part acid 

(4:1). DO NOT USE ABRASIVE CLEANERS.

Summary of Contents for DEL AOP-S

Page 1: ...4 2535 01 Rev E DEL AOP S INSTALLATION INSTRUCTIONS PRODUCT MANUAL C M P COM DEL OR VISIT C M P COM TECH Scanfor Step by step instructions SEC 50 XX...

Page 2: ...ork is performed Failure to do so could result in serious injury or death The DEL AOP S must be installed in an outdoor location or indoors in a forced air ventilated room and installed so that the or...

Page 3: ...7 3C System Shut Down 7 SECTION 4 Maintenance Service 4A System Electro Mechanical Overview 7 4B System Maintenance 8 4C Ozone Module Service 9 4D UV Lamp and Quartz Tube Service 11 4E Troubleshooting...

Page 4: ...equirements Mounting Wall or post mount in a clean protected area Ambient Temp 35 F 120 F 2 C 49 C 2A Location Mount in a clean protected area out of direct sunlight The unit must be installed in an o...

Page 5: ...l screws or other hardware appropriate for mounting surface through the two mounting holes built into the enclosure Figure 1 Mounting Location Notations cover removed Ozone Output Barb Bonding Lugs Kn...

Page 6: ...r AFTER all other equipment to avoid collection of gas in the system and possible failure of pool system components 2C 2 Pressure Test If a pressure test is required it should be performed prior to in...

Page 7: ...heater Variable Rate Check Valve Filter If Equipment is Above Water Level A Check Valve is Required Between Injector Pool Pump Dedicated Pool Return Preferred Ozone UV System Check Valve Heater Main...

Page 8: ...ssembly and reconnect the tubing to the inlet side of the check valve Secure all tube connections on the check valve assembly with tube clamps 2D Main Power Connect the DEL AOP S to the pool timing cl...

Page 9: ...as possible to start with 1 Backwash or clean filters one day before starting the AOP S 2 Superchlorinate pool water using a chlorine based shock treatment 3 Test pool chemistry and adjust pH between...

Page 10: ...t down for an extended period disconnect the AOP S from the power source and disconnect the check valve assembly tubing from the ozone output barb of the AOP S When winterizing ensure that all water i...

Page 11: ...intenance 4B 1 Ordering Information To locate a dealer nearest you call 1 800 733 9060 or visit our website www c m p com Be prepared to provide the following information Name Address Model Number Dat...

Page 12: ...check valve failure Replace the check valve assembly replacement part number 9 0770 01 immediately WARNING Trace amounts of nitric acid may be present in the check valve assembly and could be mildly...

Page 13: ...ts securing the ozone module to the backplate 5 Slide the ozone module and loosened backplate right to free the ozone module from the enclosure 6 Disconnect ozone supply tubing from ozone output barb...

Page 14: ...the power connector between the UV lamp and wire harness 3 Gently pull on the UV lamp wires until the top of the UV lamp is out of the UV lamp retainer Grasp the white ceramic end of the UV lamp and p...

Page 15: ...the UV lamp will be diminished and decrease system performance The quartz tube should be removed from the AOP S at least once a year for inspection and cleaning 1 Make sure the AOP S is drained of po...

Page 16: ...ers and tighten until the UV lamp retainer is seated completely against the quartz tube adapter 4 Turn on the pool pump and check the joint around the UV lamp retainer for leaks 5 If it leaks please c...

Page 17: ...d Ensure that the check valve is installed with the arrow pointing towards the injector e Be sure that the check valve has not become fouled with debris Disconnect the check valve assembly from the t...

Page 18: ...__________________ System Purchased From _____________________________________________ Installation Date _____________________________ Serial Number _______________________________ Model Number ______...

Page 19: ...16 NOTES...

Page 20: ...CMP LLC 36 HERRING ROAD NEWNAN GA 30265 WWW C M P COM DEL 0421AB...

Reviews: