
5
- Slide the X.KOOL
TM
neck into the torch body and tighten the neck clamp screw.
- Pull the 2 black water lines through the torch body cover.
- Connect the female coupler fitting to it’s male counterpart.
- Install the consumables the same as the standard KR502 neck.
Female Coupler Fitting
Male Coupler Fitting
Installing the X.KOOL
TM
Neck
Installation of Water Lines
- Install the torch body to the robot.
- Start with the torch body cover off of the torch body.
- Run both water lines through the holes of the torch body cover so that the quick disconnects are
hanging out the front.
- Next, with the water lines lined up so they are on the top of the torch, find the 2 holes in the torch body
base the lines will run through, and feed them through the torch body base and through the arm of the robot.
(Make sure to push enough hose though so that you can pull from the back of the 1’ cable cover.)
- Attach the torch body cover to the torch body with the water lines facing the top of the torch.
- Once you’ve pushed the water lines through the robot, attached the torch body cover, and out of the 1’ foot
cable cover, carefully pull the rest of the 15’ of water hose so that you have the desired length at the front.
Run lines
-Installation of Water Lines & Neck-