![CLIMA POD VIRTUE V9 Series Assembly Instructions Manual Download Page 22](http://html.mh-extra.com/html/clima-pod/virtue-v9-series/virtue-v9-series_assembly-instructions-manual_2624454022.webp)
22
Step 6
2
m7
Square No.1
You may loosen the bolts in corners and re-tighten it
at the trough of base legs.
Square No.2
Assemble greenhouse frame on base by connector
m7 in the middle of bottom.
Center
1
Corner
a1-M6x10
a1-M6x10
Corner
Center
a8-M6x15
a8-M6x15
With Alu. base
3
a8/a2
V943
961
Connecting greenhouse to
Aluminum Base.