![CLIMA POD VIRTUE V9 Series Assembly Instructions Manual Download Page 20](http://html.mh-extra.com/html/clima-pod/virtue-v9-series/virtue-v9-series_assembly-instructions-manual_2624454020.webp)
20
Step 4
Virtue 7’ Extension (V9 EXT A-Frame)
Part
No
.
V943
961
962
m1
a1
a2
a8
Size
2954
(9’8
5
/
16
”)
2921
(9’7”)
850
(2’9
7
/
16
”)
-
M6x10
M6
M6x15
Qty
2
2
1
1
6
14
8
V943
V943
961
961
962
1
2
3
4
5
1
2
3
4
5
V943
961
a8/a2
15mm
V943
961
a8/a2
V943
961
a8/a2
961
V943
962
a1/a2
V943
V943
961
961
a1/a2
a8/a2
Please connect V943 glazing bar first
(on both sides), then have T-shape 961
connection bar go over the V943 (on
the inside).
Please Note: The bottom end part of
T-shape 961 bar is not connected to
the base and should be secured
15mm (~5/8 inch) shorter (see image
1). This is very important
.