
17
1
2
Drill two recesses for the
pipes (for the cables) and
the built-in part for the control.
Drill two recesses for the pipes
(for the cables) and the built-in
parts for the safety sensor and
the temperature sensor.
Min. depth: 40mm
Ø 35mm
Min. 100mm
3
Drill a recess for the pipe for the
steam inlet.
Min. 150 mm
Max. 180 mm
from the floor
surface
Min. 70 mm
14.1
Explanation recess holes
Always keep a radius of 100 mm
around a sensor.
Sensors should be placed 1.8
meters from the floor surface
260 mm
95 mm
Min. depth: 50mm
Summary of Contents for Cleo Steam Brain
Page 1: ...EN Cleo Steam Brain Installation manual Item no 90179999 EN2018 09 R01...
Page 10: ...10 5 6 7 8 9 m8 8mm...
Page 24: ...24 5 Connect the 2 cables together 6 Kit the back of the controls and place it in the wall...
Page 29: ...29 2 White light 2 Connect plus and minus according to LED specifications 7 8...