
8 / 10
999-1009 Min'an Rd, Huoju Hi-tech Ind. Dev. Zone
Xiang'an District 361101, Xiamen, Fujian, China
E:
Tel: +86 592 311 0088 | SHA:603628
4.3 PV Module Installation
4.3.1
According to your plan,
install all Rails.
4.3.2
Mark the position of
PV-Module on Rails with
Marker Pen. Stretch a String
as a reference to align
PV-Module. Place the first
PV-Module on the marked
position.
4.3.3
Slide and affix the End
Clamp to the side face of
PV-Module, as shown in the
figures on the right. Fasten
the bolt refer to below
recommend torque.
Recommend torque of M8
bolt is 13N.m