4.3 PV Module Installation

 

4.3.1 
According to your plan, 
install all Rails.

 

 

4.3.2 
Mark the position of 
PV-Module on Rails with 
Marker Pen. Stretch a String 
as a reference to align 
PV-Module. Place the first 
PV-Module on the marked 
position.

 

 

4.3.3 
Slide and affix the End 
Clamp to the side face of 
PV-Module, as shown in the 
figures on the right. Fasten 
the bolt refer to below 
recommend torque. 
 
Recommend torque of M8 
bolt is 13N.m 

 

 

 

Summary of Contents for V-ezRack SolarRoof

Page 1: ...uoju Hi tech Ind Dev Zone Xiang an District 361101 Xiamen Fujian China E sales clenergy com cn W www clenergy com cn Tel 86 592 311 0088 SHA 603628 PV ezRack SolarRoof Klip Lok Interface with B50 Rail...

Page 2: ...installer is solely responsible for Complying with all applicable local or national building codes including any updates that may supersede this manual Ensuring that PV ezRack and other products are...

Page 3: ...Driver Torque Wrench Allen Key 6mm for M8 Hexagon Socket Screw Tape String Note The tools in the figure are only used for installation of rack system not included in supply scope please consult syste...

Page 4: ...lenergy com cn Tel 86 592 311 0088 SHA 603628 ER I 13 TH Klip lok Interface for Hidden 26 ER I 16 TH Klip lok interface for Standing seam 22 ER I 18 TH Interface for Standing Seam 20 ER I 20A TH Klip...

Page 5: ...Zone Xiang an District 361101 Xiamen Fujian China E sales clenergy com cn W www clenergy com cn Tel 86 592 311 0088 SHA 603628 3 System Overview 3 1 Overview of PV ezRack SolarRoof End Clamp U18 Inter...

Page 6: ...y to maintain the required torque 3 Professional tools and tool belts are recommended 4 In some cases fasteners could be seized over time As an option if want to avoid galling or seizing of thread app...

Page 7: ...String Place Klip lok Interface on the marked position as shown figures on the right 4 2 Rail Installation 4 2 1 To connect multiple rails together slide half of splices on the rear side of the pre as...

Page 8: ...SHA 603628 between the rail joints and then loosely tighten the M8 Allen bolt Note Skip this step if the rail is long enough and no need to splice 4 2 3 Affix the Rails and Klip lok Interface by Rail...

Page 9: ...n 4 3 1 According to your plan install all Rails 4 3 2 Mark the position of PV Module on Rails with Marker Pen Stretch a String as a reference to align PV Module Place the first PV Module on the marke...

Page 10: ...Tel 86 592 311 0088 SHA 603628 4 3 4 To buckle to Clamps with Z module put one leg of Z module into the channel of the Rail first then press second leg of Z module into the channel 4 3 5 Buckle the I...

Page 11: ...ce parallel to the stretched String and fasten the Inter Clamp Note Pay attention not to touch the stretched String when placing the PV Modules Recommend torque of M8 bolt is 13N m 4 3 7 Following the...

Reviews: