1. Introduction   

B50 Rail and Accessories constitute a system 

that is widely used for PV Module mounting on 

tin roofs. To make it robust and longevity, it is 

manufactured from aluminium alloy and 

stainless steel. With unique design, Z-module, it 

provides high efficient installation and the 

compatibility with most of frame PV-Modules in 

the market. 

 

Before system installation, please read the 

installation manual carefully. The manual 

provides the following content: (1) simple 

introduction of installation; (2) product 

installation specification

 

 

Please use it according to the installation 

instruction manual. Please pay attention to 

safety when installing the product, and construct 

it according to local laws and regulations. You 

can confirm the latest installation manual on 

www.clenergy.com if necessary. 

 

 

 

 

 

 

 

The installer is solely responsible for: 

  Complying with all applicable local or national 

building codes, including any updates that may 

supersede this manual;   

  Ensuring that PV-ezRack and other products 

are appropriate for the particular installation and 

the installation environment;   

  Using only PV-ezRack parts and installer 

supplied parts as specified by PV-ezRack 

project plan (substitution of parts may void the 

warranty and invalidate the letter of 

certification);   

  During installation, ensure that the 

self-tapping screws and metal screw have 

sufficient strength and shear force; 

  Keep the roof waterproof system intact; 

  Recycling: Recycle according to the local 

relative statute;   

  Removal: Reverse installation process;   

  Ensuring that there are no less than two 

professionals working on panel installation;   

  Ensuring the installation of related electrical 

equipment is performed by licenced 

electricians; 

  The upper and lower limit of the torque of the 

locking screws must be checked regularly at 

least once a year. 

  Changes and deviations from the planning 

documents must be approved by Clenergy. 

.

Contents 
 

Introduction                                        01 
Tools & Component                          02 
System Overview                              04 
Installation Instruction                      06 

Summary of Contents for V-ezRack SolarRoof

Page 1: ...uoju Hi tech Ind Dev Zone Xiang an District 361101 Xiamen Fujian China E sales clenergy com cn W www clenergy com cn Tel 86 592 311 0088 SHA 603628 PV ezRack SolarRoof Klip Lok Interface with B50 Rail...

Page 2: ...installer is solely responsible for Complying with all applicable local or national building codes including any updates that may supersede this manual Ensuring that PV ezRack and other products are...

Page 3: ...Driver Torque Wrench Allen Key 6mm for M8 Hexagon Socket Screw Tape String Note The tools in the figure are only used for installation of rack system not included in supply scope please consult syste...

Page 4: ...lenergy com cn Tel 86 592 311 0088 SHA 603628 ER I 13 TH Klip lok Interface for Hidden 26 ER I 16 TH Klip lok interface for Standing seam 22 ER I 18 TH Interface for Standing Seam 20 ER I 20A TH Klip...

Page 5: ...Zone Xiang an District 361101 Xiamen Fujian China E sales clenergy com cn W www clenergy com cn Tel 86 592 311 0088 SHA 603628 3 System Overview 3 1 Overview of PV ezRack SolarRoof End Clamp U18 Inter...

Page 6: ...y to maintain the required torque 3 Professional tools and tool belts are recommended 4 In some cases fasteners could be seized over time As an option if want to avoid galling or seizing of thread app...

Page 7: ...String Place Klip lok Interface on the marked position as shown figures on the right 4 2 Rail Installation 4 2 1 To connect multiple rails together slide half of splices on the rear side of the pre as...

Page 8: ...SHA 603628 between the rail joints and then loosely tighten the M8 Allen bolt Note Skip this step if the rail is long enough and no need to splice 4 2 3 Affix the Rails and Klip lok Interface by Rail...

Page 9: ...n 4 3 1 According to your plan install all Rails 4 3 2 Mark the position of PV Module on Rails with Marker Pen Stretch a String as a reference to align PV Module Place the first PV Module on the marke...

Page 10: ...Tel 86 592 311 0088 SHA 603628 4 3 4 To buckle to Clamps with Z module put one leg of Z module into the channel of the Rail first then press second leg of Z module into the channel 4 3 5 Buckle the I...

Page 11: ...ce parallel to the stretched String and fasten the Inter Clamp Note Pay attention not to touch the stretched String when placing the PV Modules Recommend torque of M8 bolt is 13N m 4 3 7 Following the...