4. Installation Instructions
4.1 Klip-lok Interface Installation
According your plan, mark
the position of Klip-lok
Interface on the tin roof with
Marker Pen and String.
Place Klip-lok Interface on
the marked position, as
shown figures on the right.
4.2 Rail Installation
4.2.1
To connect multiple rails
together, slide half of splices
on the rear side of the
pre-assembled rails. Fasten
the first M8 Allen bolt firmly
using the Allen key. Now
slide the next rail segment
into the other half of splice.
4.2.2
Tighten the second M8
Allen bolt using the Allen
key. The connection is
finished. An expansion gap
at the rail joints is
recommended. For this
purpose, leave a gap about
the same width as a finger