background image

Installation Guide / SolarRoof™ SADL Bracket A1

25

Code-Compliant Planning and Installation Guide V1.0 - Complying with AS/NZS1170.2-2011 AMDT 2-2016

Our Products may come with guarantees that cannot be excluded under the Australian Consumer Law. You may be 
entitled under statute to a replacement or refund for a major defect in the Products. You may also be entitled under 
statute to have the products repaired for any defect which does not amount to a major defect. The benefits given by 
this Warranty are in addition to any statutory rights and remedies you may have under Australian law.

Product Care

Clenergy Products are designed to be durable with minimal care, however it is important that you maintain your 
mounting Product in accordance with proper practices. This includes regular maintenance and inspection to avoid 
damage.

The aluminum components are made from either AL 6005CL-T5 or AL6005-T5 and may also have a clear anodization. 
The aluminum may undergo some surface oxidization in service. Please note that this is normal and part of the natural 
ageing process. The result may even be beneficial to the longevity of the Product, as the oxidization can provide 
additional protection against degradation by pollution and atmospheric corrosion.

• 

You should also ensure that if the Product is stored prior to installing that it is not contaminated by contact with rusty 

  items or other impurities such as dirt and chemicals. Should this occur, you must clean the Product and make any 
  repairs using approved methods such as galvanized paint and antirust treatments immediately before installation. 
  Steel components should be inspected before and after installation and any damage to the galvanizing should be 
  treated immediately to prevent rusting. It is normal for galvanized Products to develop a surface barrier (the ‘patina’), 
  which helps to protect the surface from contaminants in the atmosphere and does not adversely affect the Product.

• 

The torque values of fastener connections on mounting system must be checked annually and corrected if needed in 

  accordance with Clenergy Australia’s installation manual.

• 

Regular cleaning to remove any soil or other possible contaminants must also be performed. Cleaning should be 

  performed in accordance with guidelines recommended by the Standards Association of Australia (AS 1231-2000) 
  (for aluminium Products) and the Galvanizers Association of Australia (GAA) (for steel Products supplied in Australia) or 
  the Galvanizers Association of New Zealand (GANZ) (for steel Products supplied in New Zealand) or any other similar 
  organisations (as applicable). When using tin interfaces for installation works, screws not exposed to frequent rain 
  should be washed down with fresh water at least every 6 months.

- Product Warranty -

Summary of Contents for PV-ezRack SolarRoof SADL Bracket A1

Page 1: ...SADL Bracket A1 on Kingspan Roof Code Compliant Planning and Installation Guide V 1 0 Complying with AS NZS1170 2 2011 AMDT 2 2016...

Page 2: ...Australia Introduction Complying with all applicable local or national building codes including any that may supersede this manual Ensuring that PV ezRack and other products are appropriate for the i...

Page 3: ...Some areas are designated Region B 52 m s Local Region D 79 m s is Australia s most extreme Cyclonic Region located between the town of Carnarvon and Pardoo Station in Western Australia Wind regions...

Page 4: ...y to obtain a project specific engineering certificate to support your installation Note Bracket installation is allowed on the full rib of Kingspan roof only Installation on lap joints must be avoide...

Page 5: ...For example if the max interface spacing in the generic engineering certificate is 1800 mm and installed spacing is 1500 mm the maximum rail end overhang is 600 mm Acquire PV Modules Clamping Zone In...

Page 6: ...lip C U 30 46 Universal Clamp ER EC DU35 40 End Clamp Dual 35 or 40mm ER EC DU40 46 End Clamp Dual 40 or 46mm ER R ECO ECO Rail ER SP ECO Splice for ECO Rail ER I 35 SADL Bracket A1 ER I 05 Tin Interf...

Page 7: ...t and bolt assembly to reduce this risk 2 1 General installation instructions 1 Apply force to fasteners in the direction of the thread 2 Apply force uniformly to maintain the required torque 3 Profes...

Page 8: ...iver with a drive speed of 3 000 RPM maximum 3 Fit the driver bit into the screw and place it at the fastening position 4 Apply consistently firm pressure end load to the screwdriver until the screw h...

Page 9: ...e 2 rails through the pressure bolts This eliminates the need of using 2 earthing lugs Required torque is 10 12 N m 3 2 Install the Z module into the side channel of ECO Rail as shown in the figure on...

Page 10: ...Installation Guide SolarRoof SADL Bracket A1 9 Code Compliant Planning and Installation Guide V1 0 Complying with AS NZS1170 2 2011 AMDT 2 2016 Certification Certification...

Page 11: ...Installation Guide SolarRoof SADL Bracket A1 10 Code Compliant Planning and Installation Guide V1 0 Complying with AS NZS1170 2 2011 AMDT 2 2016 Certification...

Page 12: ...Installation Guide SolarRoof SADL Bracket A1 11 Code Compliant Planning and Installation Guide V1 0 Complying with AS NZS1170 2 2011 AMDT 2 2016 Certification...

Page 13: ...Installation Guide SolarRoof SADL Bracket A1 12 Code Compliant Planning and Installation Guide V1 0 Complying with AS NZS1170 2 2011 AMDT 2 2016 Certification...

Page 14: ...Installation Guide SolarRoof SADL Bracket A1 13 Code Compliant Planning and Installation Guide V1 0 Complying with AS NZS1170 2 2011 AMDT 2 2016 Certification...

Page 15: ...Installation Guide SolarRoof SADL Bracket A1 14 Code Compliant Planning and Installation Guide V1 0 Complying with AS NZS1170 2 2011 AMDT 2 2016 Certification...

Page 16: ...Installation Guide SolarRoof SADL Bracket A1 15 Code Compliant Planning and Installation Guide V1 0 Complying with AS NZS1170 2 2011 AMDT 2 2016 Certification...

Page 17: ...Installation Guide SolarRoof SADL Bracket A1 16 Code Compliant Planning and Installation Guide V1 0 Complying with AS NZS1170 2 2011 AMDT 2 2016 Certification...

Page 18: ...Installation Guide SolarRoof SADL Bracket A1 17 Code Compliant Planning and Installation Guide V1 0 Complying with AS NZS1170 2 2011 AMDT 2 2016 Certification...

Page 19: ...Installation Guide SolarRoof SADL Bracket A1 18 Code Compliant Planning and Installation Guide V1 0 Complying with AS NZS1170 2 2011 AMDT 2 2016 Certification...

Page 20: ...Installation Guide SolarRoof SADL Bracket A1 19 Code Compliant Planning and Installation Guide V1 0 Complying with AS NZS1170 2 2011 AMDT 2 2016 Certification...

Page 21: ...Installation Guide SolarRoof SADL Bracket A1 20 Code Compliant Planning and Installation Guide V1 0 Complying with AS NZS1170 2 2011 AMDT 2 2016 Certification...

Page 22: ...Installation Guide SolarRoof SADL Bracket A1 21 Code Compliant Planning and Installation Guide V1 0 Complying with AS NZS1170 2 2011 AMDT 2 2016 Certification...

Page 23: ...Installation Guide SolarRoof SADL Bracket A1 22 Code Compliant Planning and Installation Guide V1 0 Complying with AS NZS1170 2 2011 AMDT 2 2016 Certification...

Page 24: ...ustomized Product Product Warranty Corrosivity Category 1 2 and 3 Corrosivity Category 4 Corrosivity Category 5 1 Aluminium Components 6005CL T5 mill finish Standard 10 years 10 years 6005 T5 anodized...

Page 25: ...Warranty period are the responsibility of the customer Where Clenergy attends a site and finds that the Product is not faulty the costs for the visit will be payable by the customer Defective Products...

Page 26: ...hat if the Product is stored prior to installing that it is not contaminated by contact with rusty items or other impurities such as dirt and chemicals Should this occur you must clean the Product and...

Page 27: ...St Clayton VIC 2168 Australia Phone 61 3 9239 8088 Email sales clenergy com au Web www clenergy com au Clenergy Clenergy_global ClenergyClub Clenergy ClenergyGlobal ClenergyClub ClenergyAUS A Clenergy...

Reviews: