Installation Guide / SolarRoof Terracotta Tile
13
Code-Compliant Planning and Installation Guide V 1.0 - Complying with AS/NZS1170.2-2011 AMDT 2-2016
Adjust the vertical and horizontal positioning using the
long hole in the Roof Hook and the loosely connected
Z Module in the rail, as shown in the figure on the right.
The roof hook should not protrude over the rail after the
adjustment. The recommended torque is 16~20N·m.
- Installation Instructions -
±19mm
Deployment of Grounding Clips
1) When there is an even number of PV Module in each
row: Install the grounding clips at the positions marked X
in the figure shown. Then the number of Grounding Clips
= number of PV Module. Eg; 4 grounding clips in the
figure shown.
2) When there is an odd number of PV Module in each
row: Install grounding clips at positions marked X in
figure shown. Then the number of Grounding Clips =
number of PV 1. Eg; 6 grounding clips in figure
shown.
Important Notes:
- When replacing defective PV Modules, it is required
to replace the grounding clips under the defective PV
Modules.
- When removing defective PV Modules, it is required to
keep sufficient grounding clips to maintain all other PV
modules’ earthing continuity with the rail. It is required to
install grounding clips under end clamps when necessary
to achieve this.
Before installing the PV modules on horizontal rail
installations, add anti-slip protection to the lowest row
of PV modules. To do this, fasten M6 x 20 mm bolts (with
the shank downwards) to the lower mounting holes of
the PV module frame. When installing large modules (e.g.
ASE250) M8 x 20 mm bolts must be used.
PV Module Installation