BOILER BOOK CFC-E
ENGINEERING DATA
26
Condensation
The CFC-E uses one of several condensate removal options, depending on the application:
(1)
Condensate direct to drain -
The condensate is piped directly to a drain through the piping and
water trap supplied during installation (see
Figure 17
).
• Piping is to be a minimum of 3/4” NPT.
• Maximum discharge pipe height from floor to be 9”.
• Condensate water trap (5”) required.
(2)
Neutralization Capsule -
A compact, corrosion resistant capsule is piped to the condensate drain
downstream of the water trap. Capsule is filled with a replaceable neutralizing agent.
The neutralization media will require periodic replacement, to be determined by pH analysis of
condensate. If condensate is too acidic (pH is below acceptable value) the neutralization media
should be replaced.
Capsule is limited to individual boilers 1000 MBH and smaller.
Figure 18. Neutralization Capsule
Figure 17. Condensate Piped Direct to Drain
TO
DRAIN
FROM
BOILER
Summary of Contents for CFC-E 1000
Page 1: ...CFC E ClearFire Condensing Boiler Boiler Book 02 2018...
Page 52: ...BOILER BOOK CFC E EXAMPLE SYSTEM SCHEMATICS 52 Figure 38 Primary Secondary Single Boiler...
Page 53: ...BOILER BOOK CFC E EXAMPLE SYSTEM SCHEMATICS 53 Figure 39 Primary Secondary Two Boilers...
Page 54: ...BOILER BOOK CFC E EXAMPLE SYSTEM SCHEMATICS 54 Figure 40 Primary Secondary Three Boilers...
Page 55: ...BOILER BOOK CFC E EXAMPLE SYSTEM SCHEMATICS 55 Figure 41 Primary Variable Flow Single Boiler...
Page 56: ...BOILER BOOK CFC E EXAMPLE SYSTEM SCHEMATICS 56 Figure 42 Primary Variable Flow Two Boilers...
Page 57: ...BOILER BOOK CFC E EXAMPLE SYSTEM SCHEMATICS 57 Figure 43 Primary Variable Flow Three Boilers...
Page 60: ...BOILER BOOK CFC E EXAMPLE SYSTEM SCHEMATICS 60...
Page 61: ...BOILER BOOK CFC E e mail info cleaverbrooks com Web Address http www cleaverbrooks com...