CLEARSPAN
™
STORAGE MASTER
12
Revision date: 05.08.19
ASSEMBLING THE END FRAME KIT COMPONENTS
Consult the end wall diagrams in the Quick Start section of
these instructions
before
you begin.
ATTENTION:
Assistance is required to assemble the end
wall. Lifts designed to reach the top of the end rafter are
also needed. Consult a qualified construction professional
if you are not familiar with the construction of similar frame
structures.
Install the Ground Posts for Door Frame Tubes
The following steps describe one way to set the ground
posts for the door frame tubes.
1. At ground level, measure
between the legs of the end
rafter
to locate the center of the end wall. Use a plumb
line to identify the center of the overhead rafter and
mark that location on the ground as well.
NOTE:
Marking the center of the end wall allows multiple measurements to be made as needed.
2. Using the dimensions on the End Wall Frame diagrams, locate the positions of the
vertical door frame members
for
the door. The width of the door determines the frame dimensions for the door opening.
Consult the documentation
sent with the door for the correct spacing of the door frame verticals.
3. Dig a 12" diameter hole
at the locations found in previous step
to a depth that is below the geographic frost line.
4. Add concrete to the hole. Concrete should remain 1" to 2" below ground level so that it does not interfere with
construction and installation of other end wall components.
5. Determine the required width of the door and insert one 1.75" x 1.75" square tube (104075) into the concrete
approximately 8". See diagram below. Repeat the step and verify that the tubes are plumb and the correct distance
apart.
Ground Level
Concrete
*1.75" x 1.75" square
tube (104075): Half in
the concrete and half
exposed.
Ground Level
Section of the assembled
End Wall Frame.
*Not shown to scale.
Ground Level