Revision date: 03.10.08
PREPARE MAIN COVER
Gather the parts:
Ratchets (1" 4000lb)
1.315" x 75" swaged pipe (131S075)
1.315" x 25.5" plain pipe (131P0255)
Main cover
Tek screws
Assembly Procedure
NOTE:
When handling the main cover and setting it in
position, do not pull on the end straps. They will pull out of
the cover.
WARNING:
To prevent damage to the cover and to
prevent serious personal injury, DO NOT attempt to
install the main cover on windy days.
Fasten a ratchet to the end conduit using a Tek screw
in the bottom hole of the ratchet as shown below. The
ratchet should be about 6" - 8" in from the end of the
conduit.
•
•
•
•
•
1.
Assemble two main cover conduits. Start each conduit
assembly with one plain pipe and add swaged pipes to
arrive at the correct length.
3.
Locate all sections of pipe needed to assemble
the cover conduit.
Insert the swaged end of each pipe into the
plain end of another pipe until the conduit is
assembled.
Secure each pipe joint with a Tek screw.
a.
b.
c.
NOTE:
Use duct tape to tape the Tek screws to prevent
damage to main cover.
Cover conduits are inserted into the pockets sealed
into the main cover. The conduits are used to tighten
and secure the main cover.
After assembling the cover conduits, locate the main
cover and unfold it on a clean, smooth surface near the
frame.
NOTE:
Unfold the main cover with the inside surface
facing up.
Locate the cover ends with strapping and align with the
front and back of the shelter.
Insert the cover conduits into the pockets of the main
cover.
4.
5.
6.
Tek Screw
End Panel
End Conduit
Ratchet
6" - 8"
Repeat this step at all remaining corners.
2.
Cover Conduits
Cover
Ends w/
Strapping
Main Cover Pocket
Main Cover Pocket