Revision date: 06.10.11
ASSEMBLE THE DOOR HEADER
Gather the parts:
• Pipe 1.90'' x 99'' swaged (#190S099)
• Pipe 1.90'' x XX'' plain (#190P0XX)
• Band Clamp (#QH1404)
• Adjustable Tee (#105944)
• Tek Screws
The door header consists of 1.90" x 99" (#190S099)
swaged pipes (number is determined by shelter length) and
one (1) 1.90" x XX" (#190P0XX) plain pipe.
ATTENTION:
The XX" represents the remaining length
required to reach the end of the shelter. Consult the Spec
Sheet and Side Profile diagrams for part identification.
Using the following drawing
and the diagrams found in
the Quick Start Guide
, complete the steps to assemble
the door header pipes.
1. Locate the pipes required to assemble the door header.
2. Slide the swaged ends of 1.90" x 99" pipes into the
plain ends of others to assemble the door header.
Finish the door header using the plain, shorter 1.90"
pipe (#190P0XX).
3. Slide the assembled pipe through the adjustable tees
on the rafter legs. As you insert the pipe through the
fittings, slip adjustable tees and band clamps onto the
door header in the approximate locations shown in the
diagram at the bottom of the page.
ATTENTION:
Where two (2) adjustable tees meet on
the door header, position them so they mate as shown.
4. Drive a Tek screw through each 1.90" pipe joint of the
door header. See diagram below.
Adjustable Tee
Adjustable Tee
Door Header
1˝
Tek screw
NOTE:
Position the Tek screw heads so they will not
contact the cover.
5. Verify the 10' on-center measurements between the
rafter legs and tighten the hex sockets of the adjustable
tee fittings on each rafter leg.
Verify that all legs are
plumb before you tighten the set screws.
Actual frame may differ in length from frame shown.
Slide pipe through
tee fittings.
Key
T = Adjustable Tee Fitting (#105944)
B = Band Clamp (#QH1404)
T
T
T
T
T
T
T
T
T
B
B
B
B
B
B
B
B
24"
below ground
Ground Level
Ground Level