![Clearfield FieldSmart FiberFlex 2000 Installation Manual Download Page 21](http://html1.mh-extra.com/html/clearfield/fieldsmart-fiberflex-2000/fieldsmart-fiberflex-2000_installation-manual_2621180021.webp)
21
FieldSmart
®
FiberFlex 2000
__________________________________________________________
Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
Manual 021574 REV A - June 2020
Chapter 3: Preparing the Installation Site
This chapter describes how to prepare the installation site for cabinet placement, including establishing the cabinet
mounting structure. You can install the cabinet onto a concrete foundation pad, a pole, or a foundation vault.
For pad-mount applications, you can construct a concrete pad using the Clearfield cast-in-place template or use a
pre-cast concrete pad. A composite foundation vault, available from a third-party supplier, can provide easy under-cabinet
access or serve
as a riser.
For all mounting configurations, Clearfield requires installation of an earth ground circuit at the installation site to provide
lightning protection.
Topics Covered
This chapter covers the following topics:
•
Installing a ground circuit at the installation site
• Constructing a concrete pad
•
Installing a pre-cast concrete pad
•
Installing a pole mount kits
•
Installing a wall mount kit
•
Installing a composite foundation vault