background image

Page 10 of 11 

 

 
 

 

Small Support Box 

 
 
 

 
 

4.

 

Insert the small box in the channel. At this point, do not adhere the small support box to anything. 
Place the large support box into the channel and over the top of the small box. Place the CleanCut 
Ultra-Low into position and compress the CleanCut Ultra-Low downward to determine the proper 
height and placement for the support box structure. 

 

5.

 

Once the support of the CleanCut Ultra-Low has been achieved, remove the Ultra-Low and mark 
both the left and right ends of the small box where the large box is compressed while the boxes are 
in the tub opening channel. Once properly marked, remove both support boxes and label the 
markings “Left” and “Right” to avoid potential confusion. Uncompress the two support boxes from 
one another and begin the process to permanently adhere the boxes in proper position. 

 

6.

 

Apply adhesive around the perimeter of the large box. Compress the small and large support box 
structures back together to the appropriate markings made earlier on the small box. Place the 
support structure back into the channel and insert the CleanCut Ultra-Low to verify that proper 

placement has been achieved. Secure both sides of the support structure by placing two screws in 
each side (Figure 8). 

 

 

 

 
 

 

7.

 

Apply adhesive to the tops of the 2x4’s that are already in place in the channel, if they are needed 
for height adjustment and insert the support box structure. 

 

8.

 

Place the CleanCut Ultra-Low into the channel once more to inspect the fit and position. This is 

the final opportunity to make any adjustments if necessary. 

 

9.

 

Apply adhesive to the top of the large support box. It is recommended that an extra bead of 
adhesive be placed on the ends of the large support box as the CleanCut Ultra-Low curves up 
toward the ends. Place a substantial bead of adhesive on the top left and right side of the tub where 
the CleanCut Ultra-Low will be seated. Adhesive on the top of the tub reinforces the CleanCut Ultra-
Low. 

 

10.

 

Prior to placing the CleanCut Ultra-Low into the channel, it is necessary to gently pass a low flame 
several times along the perimeter of the Ultra-Low where the tub is met. This will help promote 
bonding between the CleanCut Ultra-Low and the bathtub where adhesive is applied. Use caution 
when using the torch and do not hold heat on one area of the product as it may discolor or melt. 

 

11.

 

Place the CleanCut Ultra-Low into the channel and gently press into place. 

¼

” Drywall Screws 

FIGURE 7 

Drywall Screws Holding 2x4s (each side) 

FIGURE 8 

Summary of Contents for ULTRA-LOW

Page 1: ...CLEANCUT ULTRA LOW INSTALLATION GUIDE COPYRIGHT 2020 SAFEWAY SAFETY STEP LLC DBA CleanCut All Rights Reserved Reproduction or Distribution of this Installation Manual is Strictly Prohibited...

Page 2: ...E OCCURRED DURING INSTALLATION OR SUBSEQUENT USE OF THE CLEANCUT ULTRA LOW FAILURE TO FOLLOW THE INSTRUCTIONS IN THIS INSTALLATION MANUAL SHALL VOID ANY WARRANTY GIVEN WITH RESPECT TO THE CLEANCUT ULT...

Page 3: ...allation kit the following tools and materials are recommended to have on hand for installation Additional Tools Materials Butane Torch Cardstock Paper Caulking Gun Chisels Deburring Tool i e drywall...

Page 4: ...nsiderations for cutting cast iron tubs in the following section 4 Confirm that the CleanCut Ultra Low will fit the bathtub First measure the top rail width measurement as well as the width measuremen...

Page 5: ...gs with fitting the CleanCut Ultra Low and reduces risk of injury 5 After the cut out section of the tub has been removed take a few moments to clean the area in and around the tub Using a dustpan and...

Page 6: ...side of the tub Mark this tracing Right 3 Cut out the paper templates with scissors making sure to keep to the inside of the tracings Figure 2 FIGURE 2 4 It is time to transfer the shape of our cut t...

Page 7: ...Ultra Low The inside of the tub may be irregular in shape so measurements for the inside line must be made every 3 from one end of the CleanCut Ultra Low to the other Once completed use your yard sti...

Page 8: ...the vertical ends of the CleanCut Ultra Low Remember to tilt your blade on each corner cutting all areas that have been marked 8 Place the CleanCut Ultra Low into position Remember the face with the...

Page 9: ...he conditions present during your installation For example for wooden sub floors begin by screwing or adhering with included adhesive a treated 2x4 directly to the sub floor to serve as a base for the...

Page 10: ...hieved Secure both sides of the support structure by placing two screws in each side Figure 8 7 Apply adhesive to the tops of the 2x4 s that are already in place in the channel if they are needed for...

Page 11: ...th the beads one time only as the adhesive becomes tacky to the touch quickly 4 Underneath the bottom edges of the CleanCut Ultra Low are a bit more difficult to see and the included angled nozzle sho...

Reviews: