5900S Softener Installation & Startup Guide
Page 9
www.cleanwaterstore.com
Rev 071218
Assemble the By-pass Valve
1.
When you remove the bypass valve from the box, the valves are in the open position. Holding
the bypass so that you are reading the In and Out (so that the words are not upside down to you
when holding the bypass), note the following:
2.
The red handles are slightly arrow-shaped; the pointed
end is pointing in the direction of flow when open. The
Inlet valve (on the left) turns clockwise, from full open at
“12:00 o’clock”, to full closed at “3:00 o’clock”.
3.
The Outlet valve turns clockwise from “6:00 o’clock” full
open to “9:00 o’clock” full closed. The valves are stiff
when new, so open and close them a few times.
4.
Leave both bypass valves closed for now
, so 5900 control
valve is by-passed.
5.
Note that the yoke is already attached to the
bypass, it is not necessary to remove it.
6.
Now install your water pipes to the 5900S yoke using
a small amount of Teflon tape and Teflon pipe joint
compound. Make sure inlet is installed to the 'In"
pipe connector on the bypass valve and outlet is on
the “Out” connector.
Summary of Contents for 5900S
Page 5: ...5900S Softener Installation Startup Guide Page 5 www cleanwaterstore com Rev 071218 ...
Page 19: ...5900S Softener Installation Startup Guide Page 19 www cleanwaterstore com Rev 071218 ...
Page 22: ...5900S Softener Installation Startup Guide Page 22 www cleanwaterstore com Rev 071218 ...