![CLEAN COMFORT AE14-1620-51 Installation & Operation Manual Download Page 8](http://html.mh-extra.com/html/clean-comfort/ae14-1620-51/ae14-1620-51_installation-and-operation-manual_2619994008.webp)
FILTRATION
FILTRATION
WWW.CLEANCOMFORT.COM
8
CHECKOUT
IO-AE14-5
When operating normally, with the fan running, the air
cleaner should have both the orange power switch
light and the green performance indicator light
ON
. If the
fan is running and the lights are not on, see the Trouble-
shooting Guide for probable causes and remedies.
i
CAUTION!
For most troubleshooting, the cells should be removed
from the air cleaner. A short in one of the cells will cause
the power board to shut down and the performance light
will stay off. Unless otherwise directed, remove the cells
from the unit when testing.
i
WARNING!
Electronic air cleaners use high voltage (low amperage)
power. Only trained personnel should perform service.
Electric shock can cause injury or death.
i
WARNING!
When performing LIVE tests in the power box, NEVER touch
any components inside the air cleaner other than what is
mentioned in the tests. Components carry dangerous
voltages and extreme care must be taken.
CHECKOUT – Visual
Visually check the air cleaner installation to verify that:
• The arrows on the front of the collector cells are
pointing in the direction of the airflow.
• The aluminum mesh prefilter is installed on the
upstream side of the air cleaner and the activated
carbon VOC filters are on the downstream side.
• The handles on the collector cells are facing the front
of the air cleaner cabinet.
• The collector cells and aluminum prefilters are clean
and dry.
• All joints in sheet metal between the air cleaner and
the heating and cooling system are sealed.
• Previously-installed furnace filter has been
removed (if present) and blower compartment
has been cleaned.
When you have performed the preceding physical
checkout, proceed to do the operational checkout
that follows:
CHECKOUT – Operational
1. Replace any access doors removed during the
Installation.
2. Toggle the air cleaner power switch to the
ON
position and energize the furnace or air handler
(system) fan.
3. Verify that the orange power switch is
ON
(lighted).
The orange light shows that there is power supplied
to the air cleaner.
4. Verify that the green performance indicator light
is
ON.
The green light shows that the high voltage
power supply is working correctly.
5. Turn
OFF
the system fan. The green light should go
OFF
after a few seconds, but the orange light should
remain
ON
.
6. For furnaces or air handlers with a multi-speed fan,
air cleaner operation should be verified by repeating
steps 3 through 5 for each fan speed.
7. For any issues related to air cleaner performance,
refer to Troubleshooting and Service sections in this
manual.