background image

STORAGE & MAINTENANCE

• Before each use, please carefully check and make sure all screws are tighten, carry out leakage detection and 

ensure the machine is operated in a risk free environment.

• Carry out regular checks on all hose, valves, screw and nuts, bolts etc.

• Check to make sure all the sealing rings from the connection parts are without wear and tear.

• Place the machine in a clean and dry environment once it is not in use.

• Service and maintenance should be performed regularly by a qualifi ed technician.

Unable to carryout vacuum 

extraction of cylinder

Insuffi cient of air source

Adjust air pressure to 6-9Bar/87-

130Psi

Sealing ring placed between 

cylinder and cylinder base is 

damaged or shifted.

Remove cylinder to inspect and 

replace sealing ring 

Cylinder oil ejection valve is not 

completely turn Off, or ejection 

valve is damaged.

Turn the valve OFF, fully vacuum 

the tank and check for leakage, if 

there’s no leakage means the valve 

is fi ne, if leakage is found then 

please replace a new valve.

Valves were not completely turned 

OFF while vacuum extraction is 

carry out to cylinder and oil tank

Make sure all the valves are Off 

except the one from vacuum 

generator

 HU  0059 

 70l MIXED WASTE OIL DRAINER 

Summary of Contents for HU 0059

Page 1: ...clas com RECUPERATEUR HUILE MIXTE 70l 70l MIXED WASTE OIL DRAINER HU 0059...

Page 2: ...s 8 Assurez vous que le moteur du v hicule soit teint avant d utiliser cet quipement 9 La temp rature d huile sugg r e doit tre comprise entre 40 et 60 C Une temp rature sup rieure peut entra ner une...

Page 3: ...ide de nettoyage sans d montage et autre solvant qui contient du m thanol du c tone et les liquides inflammables corrosifs etc Pression d air bar 6 8 Pression d jection de l huile bar 0 6 0 8 Consomma...

Page 4: ...t le cylindre Cet appareil a t d bogu avant de quitter l usine Ne pas modifier la position de l anneau de retenue Cylindre R servoir Vis hexagonale Extraction du vide pour le cylindre 1 V rifier que l...

Page 5: ...vrir la valve de gaz et commencer vacuer le vide de l appareil 5 Lorsque l indicateur de vide atteint le point de jonction entre le rouge et le vert le pompage vide est termin 6 Lorsque l extraction d...

Page 6: ...de br lure La temp rature d huile ne doit pas d passer 60 C Un d passement peut entra ner de graves dommages sur les composants ou peut entra ner une panne de la machine R cup rer l huile du r cup rat...

Page 7: ...n n cessaire pour le drainage d huile est atteinte La valve de s curit lib re la pression automatiquement lorsque la pression du r servoir atteint 1 0 bar 15 4 PSI Couper ensuite imm diatement la sour...

Page 8: ...ur de vide Valve d jection d huile du r cup rateur d huile Mini valve bille du tuyau d extraction Valve embouchure d admission d air du r servoir Valve bille du tuyau d jection d huile HU 0059 RECUPER...

Page 9: ...rts Explosion du cylindre Valve d jection d huile du cylindre ouverte pendant le drainage de l huile us e du r servoir d huile La pression positive l int rieur du r servoir est imm diatement propuls e...

Page 10: ...on de vide du cylindre Source d air insuffisante R glez la pression d air 6 9 bar 87 130 Psi La bague d tanch it plac e entre le cylindre et la base du cylindre est endommag e ou s est d pla c e Retir...

Page 11: ...w the recommended operating air pressure 7 Always make sure to turn off oil ejection valve from cylinder before oil draining otherwise it could lead to explosive of cylinder and cause body injury 8 Ma...

Page 12: ...eights The machine is applies to extraction and temporary storage of all mechanical lubricating oil Strictly prohibit in extraction of brake fluid gasoline diesel dismantle free cleaning fluid and any...

Page 13: ...oper height avoid contact of oil tray and cylinder against each other This machine has been debugging before leaving the factory please do not make alternation of the position retaining ring Cylinder...

Page 14: ...pen 4 Open gas valve and start to vacuum the equipment 5 When the indicator of vacuum gauge reaches the junction of red and green the vacuum pump is completed 6 When vacuum extraction is completed tur...

Page 15: ...th during oil extraction to avoid scald Oil temperature shall not exceed 60 C It will cause serious damage to the components in worse case it could lead to machine failure Oil collection from oil tray...

Page 16: ...nce it reached desired pressure needed for oil draining Safety valve will automatically release pressure when the tank pressure reach 1 0 bar 15 4PSI now cut off air source immediately and quickly dro...

Page 17: ...FIGURE Vacuum generator valve Oil ejection valve of oil tray Mini ball valve of extraction hose Tank air inlet mouth valve Ball valve of oil ejection hose HU 0059 70l MIXED WASTE OIL DRAINER...

Page 18: ...avoid hit and knock Cylinder explosion Cylinder oil ejection valve was opened while draining waste oil from oil tank positive pressure inside the tank instantly pushes in the cylinder which leads to...

Page 19: ...n Unable to carryout vacuum extraction of cylinder Insufficient of air source Adjust air pressure to 6 9Bar 87 130Psi Sealing ring placed between cylinder and cylinder base is damaged or shifted Remov...

Page 20: ...cien de votre distributeur agr If you need components or parts please contact the reseller In case of problems please contact your authorized technician CLAS Equipements ZA de la CROUZA 73800 CHIGNIN...

Reviews: