The lift must be decommissioned
·
in case of a longer standstill;
·
for the time of repair or maintenance works;
·
if the safe operation of the lift cannot be granted for any reason.
To decommission, proceed in the following order:
1.
Fully lower the carriages and remove any vehicle possibly positioned on
the unit.
2.
Move the carriages up by 250 – 300 mm.
3.
Put the carrying arms into a central position.
4.
Disconnect the unit power supply.
5.
Screw off the fuse.
6.
Secure the working area of the lift against further access.
7.
Put up a ‘Do not operate’ sign on a visible place on the lift.
8.
Lock the selector switch in position ‘0’ using a padlock.
DECOMMISSIONING
Summary of Contents for Strong-Arm CPL30T
Page 2: ...International 2...
Page 22: ...International 22 Figure 1 MAIN COMPONENTS...
Page 23: ...International 23 Figure 2 DIMENSIONS...
Page 24: ...International 24 Figure 3 GROUND PLAN DIMENSIONS SWIVEL RANGE...
Page 25: ...International 25 Figure 4 CIRCUIT DIAGRAM...
Page 26: ...International 26 Figures 5 6 CONTROL BOX CONTROL CABLE...
Page 27: ...International 27 Figure 7 POWER SUPPLY 1...
Page 28: ...International 28 Figure 8 CONTROL ROD...
Page 29: ...International 29 Figure 9 OIL TANK for spindle lubrication...
Page 30: ...International 30 Figure 10 SUPPORTING SAFETY NUT...
Page 31: ...International 31 Figure 11 CARRIAGE...
Page 32: ...International 32 CARRIAGE Figure 12...
Page 33: ...International 33 Figure 13 SWIVEL ARM SHORT...
Page 34: ...International 34 Figure 14 SWIVEL ARM LONG...
Page 35: ...International 35 Figure 15 PARTS DIAGRAM...
Page 40: ...International 40...