International
6
Basic conditions for operation
The lift can only be installed on a level concrete foundation with solid floor
covering.
Concrete quality: B 25 according to DIN 1045. The deviation of the concrete
slab from level must not exceed 10 mm on a length of 1,000 mm. The lift must
not be installed in a hazardous location (potentially explosive environment).
The lift must only be used with its base frame properly fastened using anchors.
Operating voltage:
3 x 380/220 V, 50 Hz
Power consumption:
3 kW
The lift must not be installed in open areas or in humid locations.
Installation, foundation
When determining the place of installation, the convenient access to the lift
and the drive-through direction should be considered. The power connection
cable must be lead to the lift overhead (see Fig. 7). The electrical installation
and connection is to be carried out by qualified personnel only; the applicable
CE regulations must be strictly adhered to. The completely assembled frame
is put on the prepared concrete foundation as shown in Fig. 3. The anchor
threadings in the base frame are sketched onto the concrete slab; then, the
appropriate holes for the anchor plugs are drilled. The bolts (anchors) of the
base frame are then fixed with a torque of 80-120 Nm.
Operation
The unit is an electromechanical lifting device driven by an electric motor
over a screw rod. The installed lift is shown in Fig. 1; the most important
dimensions can be seen from Fig. 2 and 3.
Technical description
Summary of Contents for Strong-Arm CPL30T
Page 2: ...International 2...
Page 22: ...International 22 Figure 1 MAIN COMPONENTS...
Page 23: ...International 23 Figure 2 DIMENSIONS...
Page 24: ...International 24 Figure 3 GROUND PLAN DIMENSIONS SWIVEL RANGE...
Page 25: ...International 25 Figure 4 CIRCUIT DIAGRAM...
Page 26: ...International 26 Figures 5 6 CONTROL BOX CONTROL CABLE...
Page 27: ...International 27 Figure 7 POWER SUPPLY 1...
Page 28: ...International 28 Figure 8 CONTROL ROD...
Page 29: ...International 29 Figure 9 OIL TANK for spindle lubrication...
Page 30: ...International 30 Figure 10 SUPPORTING SAFETY NUT...
Page 31: ...International 31 Figure 11 CARRIAGE...
Page 32: ...International 32 CARRIAGE Figure 12...
Page 33: ...International 33 Figure 13 SWIVEL ARM SHORT...
Page 34: ...International 34 Figure 14 SWIVEL ARM LONG...
Page 35: ...International 35 Figure 15 PARTS DIAGRAM...
Page 40: ...International 40...